Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
BP 25-15 Florence High School Bleacher Addition Project

The project consists of a new bleacher addition at the Florence High School football field. This includes new concrete bleacher pad and site work as well as relocation of the existing handicap ramp that serves the existing bleachers. The project will be phased to allow site work and concrete work to be done during RCSD summer break with bleachers to be installed as soon as the manufacturing and delivery allows.
           Place Order 
  Name Spec Sheet(Click to View)
File Size / Approx. Download Time (56k Modem)
Description
  DPR Viewable Specs
DPR_Viewable_Specs.pdf
8998 KB / 20m 55s