Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
SCSD Mize K4 Renovation and Baseball Lighting

The work shall include the interior renovation of the existing cafeteria building into a new Kindergarten classroom building. Exterior work shall include new windows in classrooms, new exterior doors and frames, handicapped access ramp with new sidewalks, minor storm drainage upgrades and minor modifications to rooftop curbs where units are removed. Interior work shall include new interior drywall partitions, new lay-in acoustical tile ceiling systems, new flooring and painting, new plumbing fixtures, water distribution and drainage piping, new HVAC units for each classroom, new lights and utility outlets. Structural renovation will include trenching of the existing floor slab for new sewer installation, cutting of the existing floor slab to install footings for the new columns/beams where interior concrete block bearing walls are to be removed. Security measures that will be included are magnetic locks on all exterior classroom doors and security cameras on interior and exterior of building. All classrooms shall include new millwork. Also included in this work is the replacement of the lighting at the campus baseball field.
           Place Order 
  Name Spec Sheet(Click to View)
File Size / Approx. Download Time (56k Modem)
Description
  DPR Viewable Specs
DPR_Viewable_Specs.pdf
8743 KB / 20m 20s