SCSD Mize K4 Renovation and Baseball Lighting
The work shall include the interior renovation of the existing cafeteria building into a new Kindergarten classroom building. Exterior work shall include new windows in classrooms, new exterior doors and frames, handicapped access ramp with new sidewalks, minor storm drainage upgrades and minor modifications to rooftop curbs where units are removed. Interior work shall include new interior drywall partitions, new lay-in acoustical tile ceiling systems, new flooring and painting, new plumbing fixtures, water distribution and drainage piping, new HVAC units for each classroom, new lights and utility outlets. Structural renovation will include trenching of the existing floor slab for new sewer installation, cutting of the existing floor slab to install footings for the new columns/beams where interior concrete block bearing walls are to be removed. Security measures that will be included are magnetic locks on all exterior classroom doors and security cameras on interior and exterior of building. All classrooms shall include new millwork. Also included in this work is the replacement of the lighting at the campus baseball field.
Place Order
Name
Delivery Method
Date
Addendum_#_1.pdf
10/23/2024
Addendum_#_2.pdf
10/30/2024
Addendum_#_3.pdf
11/7/2024
Addendum_#_4.pdf
11/12/2024