Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
GS# 102-281 Performing Arts ADA Compliance Delta State University

This project comprises an addition to Delta State University’s Bologna Performing Arts Center, the addition houses new restrooms and an elevator. Minor interior renovations to the existing Bologna Performing Arts Center are also in the project.
           Place Order 
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 TS
SHEET INDEX SCOPE OF WORK CODE SUMMARY SITE DEMO PLAN SILT FENCE
001-TS_SHEET_INDEX_SCOPE_OF_WORK_CODE_SUMMARY_SITE_DEMO_PLAN_SILT_FENCE.tif
273 KB
 002
 C1
TOPOGRAPHIC SURVEY
002-C1_TOPOGRAPHIC_SURVEY.tif
316 KB
 003
 1.0
SITE PLAN ENLARGED SITE PLANS SITE DETAILS
003-1.0_SITE_PLAN_ENLARGED_SITE_PLANS_SITE_DETAILS.tif
858 KB
 004
 2.0
FLOOR PLANS PLAN DETAILS
004-2.0_FLOOR_PLANS_PLAN_DETAILS.tif
863 KB
 005
 2.1
FIRST SECOND FLOOR ENLARGED PLAN THEATER ADA MODIFICATIONS DETAILS
005-2.1_FIRST_SECOND_FLOOR_ENLARGED_PLAN_THEATER_ADA_MODIFICATIONS_DETAILS.tif
805 KB
 006
 3.0
FINISH DOOR WINDOWS SCHEDULES DETAILS
006-3.0_FINISH_DOOR_WINDOWS_SCHEDULES_DETAILS.tif
896 KB
 007
 4.0
FIRST AND SECOND FLOOR RCPs ROOF PLAN DETAILS
007-4.0_FIRST_AND_SECOND_FLOOR_RCP's_ROOF_PLAN_DETAILS.tif
782 KB
 008
 5.0
EXTERIOR ELEVATIONS UNIT PRICES ASSUMPTIONS
008-5.0_EXTERIOR_ELEVATIONS_UNIT_PRICES_ASSUMPTIONS.tif
768 KB
 009
 6.0
BUILDING SECTIONS DETAILS
009-6.0_BUILDING_SECTIONS_DETAILS.tif
862 KB
 010
 7.0
WALL SECTIONS DETAILS
010-7.0_WALL_SECTIONS_DETAILS.tif
989 KB
 011
 S0.1
GENERAL NOTES SPECIAL INSPECTION DESIGN BUILDING CODE WIND LOADING NOTES SEISMIC NOTES
011-S0.1_GENERAL_NOTES_SPECIAL_INSPECTION_DESIGN_BUILDING_CODE_WIND_LOADING_NOTES_SEISMIC_NOTES.tif
342 KB
 012
 S0.2
3D VIEWS
012-S0.2_3D_VIEWS.tif
1415 KB
 013
 S1.1
FOUNDATION PLAN
013-S1.1_FOUNDATION_PLAN.tif
290 KB
 014
 S1.2
2ND FLOOR FRAMING PLAN
014-S1.2_2ND_FLOOR_FRAMING_PLAN.tif
257 KB
 015
 S1.3
ROOF FRAMING PLAN
015-S1.3_ROOF_FRAMING_PLAN.tif
245 KB
 016
 S2.1
CMU ELEVATIONS
016-S2.1_CMU_ELEVATIONS.tif
289 KB
 017
 S2.2
BUILDING SECTIONS
017-S2.2_BUILDING_SECTIONS.tif
301 KB
 018
 S2.3
BUILDING SECTIONS
018-S2.3_BUILDING_SECTIONS.tif
314 KB
 019
 S3.1
FOUNDATION DETAILS
019-S3.1_FOUNDATION_DETAILS.tif
306 KB
 020
 S3.2
FRAMING STEEL DETAILS
020-S3.2_FRAMING_STEEL_DETAILS.tif
328 KB
 021
 S3.3
FRAMING STEEL DETAILS
021-S3.3_FRAMING_STEEL_DETAILS.tif
233 KB
 022
 P1.0
FIRST FLOOR PLAN PLUMBING
022-P1.0_FIRST_FLOOR_PLAN_PLUMBING.tif
266 KB
 023
 P1.1
SECOND FLOOR PLAN PLUMBING
023-P1.1_SECOND_FLOOR_PLAN_PLUMBING.tif
213 KB
 024
 MD1.0
FIRST FLOOR PLAN HVAC DEMOLITION
024-MD1.0_FIRST_FLOOR_PLAN_HVAC_DEMOLITION.TIF
115 KB
 025
 M1.0
FIRST FLOOR PLAN HVAC
025-M1.0_FIRST_FLOOR_PLAN_HVAC.tif
268 KB
 026
 M1.1
SECOND FLOOR PLAN HVAC
026-M1.1_SECOND_FLOOR_PLAN_HVAC.tif
217 KB
 027
 M2.0
SCHEDULES AND DETAILS
027-M2.0_SCHEDULES_AND_DETAILS.TIF
290 KB
 028
 FP1.0
FIRST FLOOR PLAN FIRE PROTECTION
028-FP1.0_FIRST_FLOOR_PLAN_FIRE_PROTECTION.tif
248 KB
 029
 FP1.1
SECOND FLOOR PLAN FIRE PROTECTION
029-FP1.1_SECOND_FLOOR_PLAN_FIRE_PROTECTION.tif
205 KB
 030
 E0.1
LEGEND NOTES
030-E0.1_LEGEND_NOTES.tif
283 KB
 031
 E0.2
LUMINAIRE SCHEDULE CIRCUIT SCHEDULE
031-E0.2_LUMINAIRE_SCHEDULE_CIRCUIT_SCHEDULE.tif
1111 KB
 032
 E1.0
FIRST AND SECOND FLOOR PARTIAL PLANS LIGHTING
032-E1.0_FIRST_AND_SECOND_FLOOR_PARTIAL_PLANS_LIGHTING.tif
283 KB
 033
 E2.0
FIRST AND SECOND FLOOR PARTIAL PLANS POWER AND MECH CONNECTIONS
033-E2.0_FIRST_AND_SECOND_FLOOR_PARTIAL_PLANS_POWER_AND_MECH_CONNECTIONS.tif
285 KB
 034
 E3.0
FIRST AND SECOND FLOOR PARTIAL PLANS FIRE ALARM SPECIAL SYSTEMS
034-E3.0_FIRST_AND_SECOND_FLOOR_PARTIAL_PLANS_FIRE_ALARM_SPECIAL_SYSTEMS.tif
299 KB
 035
 E4.0
SITE PLAN POWER SPECIAL SYSTEMS
035-E4.0_SITE_PLAN_POWER_SPECIAL_SYSTEMS.tif
597 KB