Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
GS# 102-281 Performing Arts ADA Compliance Delta State University
This project comprises an addition to Delta State University’s Bologna Performing Arts Center, the addition houses new restrooms and an elevator. Minor interior renovations to the existing Bologna Performing Arts Center are also in the project.
Place Order
#
Sheet #
Sheet Name
Image Name (Click To View)
File Size
001
TS
SHEET INDEX SCOPE OF WORK CODE SUMMARY SITE DEMO PLAN SILT FENCE
001-TS_SHEET_INDEX_SCOPE_OF_WORK_CODE_SUMMARY_SITE_DEMO_PLAN_SILT_FENCE.tif
273 KB
002
C1
TOPOGRAPHIC SURVEY
002-C1_TOPOGRAPHIC_SURVEY.tif
316 KB
003
1.0
SITE PLAN ENLARGED SITE PLANS SITE DETAILS
003-1.0_SITE_PLAN_ENLARGED_SITE_PLANS_SITE_DETAILS.tif
858 KB
004
2.0
FLOOR PLANS PLAN DETAILS
004-2.0_FLOOR_PLANS_PLAN_DETAILS.tif
863 KB
005
2.1
FIRST SECOND FLOOR ENLARGED PLAN THEATER ADA MODIFICATIONS DETAILS
005-2.1_FIRST_SECOND_FLOOR_ENLARGED_PLAN_THEATER_ADA_MODIFICATIONS_DETAILS.tif
805 KB
006
3.0
FINISH DOOR WINDOWS SCHEDULES DETAILS
006-3.0_FINISH_DOOR_WINDOWS_SCHEDULES_DETAILS.tif
896 KB
007
4.0
FIRST AND SECOND FLOOR RCPs ROOF PLAN DETAILS
007-4.0_FIRST_AND_SECOND_FLOOR_RCP's_ROOF_PLAN_DETAILS.tif
782 KB
008
5.0
EXTERIOR ELEVATIONS UNIT PRICES ASSUMPTIONS
008-5.0_EXTERIOR_ELEVATIONS_UNIT_PRICES_ASSUMPTIONS.tif
768 KB
009
6.0
BUILDING SECTIONS DETAILS
009-6.0_BUILDING_SECTIONS_DETAILS.tif
862 KB
010
7.0
WALL SECTIONS DETAILS
010-7.0_WALL_SECTIONS_DETAILS.tif
989 KB
011
S0.1
GENERAL NOTES SPECIAL INSPECTION DESIGN BUILDING CODE WIND LOADING NOTES SEISMIC NOTES
011-S0.1_GENERAL_NOTES_SPECIAL_INSPECTION_DESIGN_BUILDING_CODE_WIND_LOADING_NOTES_SEISMIC_NOTES.tif
342 KB
012
S0.2
3D VIEWS
012-S0.2_3D_VIEWS.tif
1415 KB
013
S1.1
FOUNDATION PLAN
013-S1.1_FOUNDATION_PLAN.tif
290 KB
014
S1.2
2ND FLOOR FRAMING PLAN
014-S1.2_2ND_FLOOR_FRAMING_PLAN.tif
257 KB
015
S1.3
ROOF FRAMING PLAN
015-S1.3_ROOF_FRAMING_PLAN.tif
245 KB
016
S2.1
CMU ELEVATIONS
016-S2.1_CMU_ELEVATIONS.tif
289 KB
017
S2.2
BUILDING SECTIONS
017-S2.2_BUILDING_SECTIONS.tif
301 KB
018
S2.3
BUILDING SECTIONS
018-S2.3_BUILDING_SECTIONS.tif
314 KB
019
S3.1
FOUNDATION DETAILS
019-S3.1_FOUNDATION_DETAILS.tif
306 KB
020
S3.2
FRAMING STEEL DETAILS
020-S3.2_FRAMING_STEEL_DETAILS.tif
328 KB
021
S3.3
FRAMING STEEL DETAILS
021-S3.3_FRAMING_STEEL_DETAILS.tif
233 KB
022
P1.0
FIRST FLOOR PLAN PLUMBING
022-P1.0_FIRST_FLOOR_PLAN_PLUMBING.tif
266 KB
023
P1.1
SECOND FLOOR PLAN PLUMBING
023-P1.1_SECOND_FLOOR_PLAN_PLUMBING.tif
213 KB
024
MD1.0
FIRST FLOOR PLAN HVAC DEMOLITION
024-MD1.0_FIRST_FLOOR_PLAN_HVAC_DEMOLITION.TIF
115 KB
025
M1.0
FIRST FLOOR PLAN HVAC
025-M1.0_FIRST_FLOOR_PLAN_HVAC.tif
268 KB
026
M1.1
SECOND FLOOR PLAN HVAC
026-M1.1_SECOND_FLOOR_PLAN_HVAC.tif
217 KB
027
M2.0
SCHEDULES AND DETAILS
027-M2.0_SCHEDULES_AND_DETAILS.TIF
290 KB
028
FP1.0
FIRST FLOOR PLAN FIRE PROTECTION
028-FP1.0_FIRST_FLOOR_PLAN_FIRE_PROTECTION.tif
248 KB
029
FP1.1
SECOND FLOOR PLAN FIRE PROTECTION
029-FP1.1_SECOND_FLOOR_PLAN_FIRE_PROTECTION.tif
205 KB
030
E0.1
LEGEND NOTES
030-E0.1_LEGEND_NOTES.tif
283 KB
031
E0.2
LUMINAIRE SCHEDULE CIRCUIT SCHEDULE
031-E0.2_LUMINAIRE_SCHEDULE_CIRCUIT_SCHEDULE.tif
1111 KB
032
E1.0
FIRST AND SECOND FLOOR PARTIAL PLANS LIGHTING
032-E1.0_FIRST_AND_SECOND_FLOOR_PARTIAL_PLANS_LIGHTING.tif
283 KB
033
E2.0
FIRST AND SECOND FLOOR PARTIAL PLANS POWER AND MECH CONNECTIONS
033-E2.0_FIRST_AND_SECOND_FLOOR_PARTIAL_PLANS_POWER_AND_MECH_CONNECTIONS.tif
285 KB
034
E3.0
FIRST AND SECOND FLOOR PARTIAL PLANS FIRE ALARM SPECIAL SYSTEMS
034-E3.0_FIRST_AND_SECOND_FLOOR_PARTIAL_PLANS_FIRE_ALARM_SPECIAL_SYSTEMS.tif
299 KB
035
E4.0
SITE PLAN POWER SPECIAL SYSTEMS
035-E4.0_SITE_PLAN_POWER_SPECIAL_SYSTEMS.tif
597 KB