Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
GS# 320-080 ARPA Infr.-WCCF Storm
This project consists of connecting the existing roof drain downspouts to the storm drainage system, the installation of new storm drainage pipes and inlets, point repairs and grading to provide positive drainage away from the existing buildings at the Wilkinson County Correctional Facility in Wilkinson County, Mississippi.
Place Order
Name
Spec Sheet(Click to View)
File Size / Approx. Download Time (56k Modem)
Description
DPR Viewable Specs
DPR_Viewable_Specs.pdf
4250 KB / 9m 53s