Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Football Field Turf and Track Replacement Velma Jackson High School

Work includes the removal of existing field and track surfacing, various repairs to the drainage and subsurface conditions and the full replacement of the turf and track surfacing.
           Place Order 
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 R000
COVER SHEET
001-R000_COVER_SHEET.tiff
5795 KB
 002
 R100
PROJECT INFO
002-R100_PROJECT_INFO.tiff
2295 KB
 003
 R200
RENDERING & SCOPE
003-R200_RENDERING_&_SCOPE.tiff
14919 KB
 004
 C0.1
GEMERAL NOTES
004-C0.1_GEMERAL_NOTES.tiff
875 KB
 005
 C0.2
EXISTING CONDITIONS DEMO
005-C0.2_EXISTING_CONDITIONS_DEMO.tiff
762 KB
 006
 C1.0
SITE LAYOUT & DRAINAGE IMPROVEMENTS
006-C1.0_SITE_LAYOUT_&_DRAINAGE_IMPROVEMENTS.tiff
784 KB
 007
 C2.1
SITE GRADING
007-C2.1_SITE_GRADING.tiff
809 KB
 008
 C2.2
SITE GRADING
008-C2.2_SITE_GRADING.tiff
652 KB
 009
 C4.0
EROSION CONTROL
009-C4.0_EROSION_CONTROL.tiff
737 KB
 010
 C5.1
CONSTRUCTION DETAILS
010-C5.1_CONSTRUCTION_DETAILS.tiff
780 KB
 011
 C5.2
CONSTRUCTION DETAILS
011-C5.2_CONSTRUCTION_DETAILS.tiff
656 KB
 012
 A101
SITE PLAN TRACK & FIELD
012-A101_SITE_PLAN_TRACK_&_FIELD.tiff
768 KB
 013
 A102
TYPICAL DETAILS
013-A102_TYPICAL_DETAILS.tiff
611 KB