Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
WBA Project# 22-056 Pearl Junior High School Multipurpose Building

Base bid includes new 1-story brick and metal wall panel clad multipurpose building. Structure consists of a reinforced concrete caisson foundation and slab on void forms, cmu bearing walls & steel joist supported mod-bit roof. See drawings and specs for detailed information. Project Add Alternates include select interior renovations at existing gymnasium and locker room building, new site access drive. See Alternates section 01.2300 contained in the Project Manual.
           Place Order 
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 R000
COVER SHEET
001-R000_COVER_SHEET.tiff
4886 KB
 002
 R100
PROJECT INFO
002-R100_PROJECT_INFO.tiff
2121 KB
 003
 R200
LIFE SAFETY & COMPLIANCE
003-R200_LIFE_SAFETY_&_COMPLIANCE.tiff
832 KB
 004
 R201
ACCESSIBILITY COMPLIANCE
004-R201_ACCESSIBILITY_COMPLIANCE.tiff
840 KB
 005
 R300
SITE SURVEY
005-R300_SITE_SURVEY.tiff
626 KB
 006
 C100
GENERAL CONSTRUCTION NOTES
006-C100_GENERAL_CONSTRUCTION_NOTES.tiff
1097 KB
 007
 C200
SITE DEMOLITION PLAN
007-C200_SITE_DEMOLITION_PLAN.tiff
728 KB
 008
 C201
SITE PLAN
008-C201_SITE_PLAN.tiff
565 KB
 009
 C300
UTILITY LAYOUT
009-C300_UTILITY_LAYOUT.tiff
656 KB
 010
 C301
GRADING PLAN
010-C301_GRADING_PLAN.tiff
678 KB
 011
 C302
STORM DRAIN LAYOUT
011-C302_STORM_DRAIN_LAYOUT.tiff
781 KB
 012
 C303
EROSION CONTROL PLAN
012-C303_EROSION_CONTROL_PLAN.tiff
705 KB
 013
 C400
GENERAL CONSTRUCTION NOTES
013-C400_GENERAL_CONSTRUCTION_NOTES.tiff
737 KB
 014
 C401
WATER DETAILS
014-C401_WATER_DETAILS.tiff
632 KB
 015
 C402
SEWER DETAILS
015-C402_SEWER_DETAILS.tiff
558 KB
 016
 C403
SEWER DETAILS
016-C403_SEWER_DETAILS.tiff
849 KB
 017
 C404
EROSION CONTROL DETAILS
017-C404_EROSION_CONTROL_DETAILS.tiff
716 KB
 018
 S100
STRUCTURAL NOTES
018-S100_STRUCTURAL_NOTES.tiff
830 KB
 019
 S101
STRUCTURAL QUALITY ASSURANCE
019-S101_STRUCTURAL_QUALITY_ASSURANCE.tiff
770 KB
 020
 S200
NEW ADDITION DRILLED PIER PLAN
020-S200_NEW_ADDITION_DRILLED_PIER_PLAN.tiff
641 KB
 021
 S201
NEW ADDITION FOUNDATION PLAN
021-S201_NEW_ADDITION_FOUNDATION_PLAN.tiff
658 KB
 022
 S202
NEW ADDITION CMU WALL PLAN
022-S202_NEW_ADDITION_CMU_WALL_PLAN.tiff
627 KB
 023
 S203
NEW ADDITION LOWER ROOF FRAMING PLAN
023-S203_NEW_ADDITION_LOWER_ROOF_FRAMING_PLAN.tiff
646 KB
 024
 S204
NEW ADDITION UPPER ROOF FRAMING PLAN
024-S204_NEW_ADDITION_UPPER_ROOF_FRAMING_PLAN.tiff
617 KB
 025
 S205
BASEMENT FOUNDATION PLAN ALTERNATE 1
025-S205_BASEMENT_FOUNDATION_PLAN_ALTERNATE_1.tiff
668 KB
 026
 S300
DETAILS
026-S300_DETAILS.tiff
746 KB
 027
 S301
DETAILS
027-S301_DETAILS.tiff
728 KB
 028
 S302
DETAILS
028-S302_DETAILS.tiff
641 KB
 029
 S303
DETAILS
029-S303_DETAILS.tiff
578 KB
 030
 S304
DETAILS
030-S304_DETAILS.tiff
633 KB
 031
 S305
DETAILS
031-S305_DETAILS.tiff
712 KB
 032
 D101
SITE DEMO PLAN ALTERNATE 3
032-D101_SITE_DEMO_PLAN_ALTERNATE_3.tiff
801 KB
 033
 D102
BASEMENT DEMO PLAN ALTERNATE 1
033-D102_BASEMENT_DEMO_PLAN_ALTERNATE_1.tiff
941 KB
 034
 D103
BASEMENT RCP DEMO PLAN ALTERNATE 1
034-D103_BASEMENT_RCP_DEMO_PLAN_ALTERNATE_1.tiff
844 KB
 035
 D104
FIRST FLOOR DEMO PLAN ALTERNATE 2
035-D104_FIRST_FLOOR_DEMO_PLAN_ALTERNATE_2.tiff
727 KB
 036
 D105
FIRST FLOOR RCP DEMO PLAN ALTERNATE 2
036-D105_FIRST_FLOOR_RCP_DEMO_PLAN_ALTERNATE_2.tiff
786 KB
 037
 A001
SITE PLAN
037-A001_SITE_PLAN.tiff
655 KB
 038
 A002
ENLARGED SITE PLAN
038-A002_ENLARGED_SITE_PLAN.tiff
960 KB
 039
 A003
TRAFFIC FLOW PHASING PLANS
039-A003_TRAFFIC_FLOW_PHASING_PLANS.tiff
823 KB
 040
 A101
OVERALL BASEMENT FLOOR PLAN
040-A101_OVERALL_BASEMENT_FLOOR_PLAN.tiff
693 KB
 041
 A102-OVERALL
FIRST FLOOR PLAN
041-A102-OVERALL_FIRST_FLOOR_PLAN.tiff
678 KB
 042
 A103
NEW ADDITION FLOOR PLAN
042-A103_NEW_ADDITION_FLOOR_PLAN.tiff
677 KB
 043
 A104
ENLARGED BASEMENT PLAN ALTERNATE 1
043-A104_ENLARGED_BASEMENT_PLAN_ALTERNATE_1.tiff
746 KB
 044
 A105
OVERALL BASEMENT RCP
044-A105_OVERALL_BASEMENT_RCP.tiff
900 KB
 045
 A106
OVERALL 1ST FLOOR RCP ALTERNATE 2
045-A106_OVERALL_1ST_FLOOR_RCP_ALTERNATE_2.tiff
701 KB
 046
 A107
NEW ADDITION RCP
046-A107_NEW_ADDITION_RCP.tiff
977 KB
 047
 A108
ENLARGED BASEMENT RCP ALTERNATE 1
047-A108_ENLARGED_BASEMENT_RCP_ALTERNATE_1.tiff
786 KB
 048
 A109
OVERALL ROOF PLAN
048-A109_OVERALL_ROOF_PLAN.tiff
685 KB
 049
 A201
EXTERIOR ELEVATIONS
049-A201_EXTERIOR_ELEVATIONS.tiff
633 KB
 050
 A202
EXTERIOR ELEVATIONS
050-A202_EXTERIOR_ELEVATIONS.tiff
621 KB
 051
 A203
BUILDING SECTIONS
051-A203_BUILDING_SECTIONS.tiff
773 KB
 052
 A204
BUILDING SECTIONS
052-A204_BUILDING_SECTIONS.tiff
790 KB
 053
 A205
BUILDING SECTIONS ALTERNATE 1
053-A205_BUILDING_SECTIONS_ALTERNATE_1.tiff
693 KB
 054
 A301
WALL SECTIONS BASE BID
054-A301_WALL_SECTIONS_BASE_BID.tiff
777 KB
 055
 A302
WALL SECTIONS BASE BID
055-A302_WALL_SECTIONS_BASE_BID.tiff
720 KB
 056
 A303
WALL SECTIONS ALTERNATE 1
056-A303_WALL_SECTIONS_ALTERNATE_1.tiff
766 KB
 057
 A304
STAIRS RAMP ENLARGED PLANS AND SECTIONS
057-A304_STAIRS_RAMP_ENLARGED_PLANS_AND_SECTIONS.tiff
845 KB
 058
 A305
STAIRS RAMP ENLARGED PLANS AND SECTIONS
058-A305_STAIRS_RAMP_ENLARGED_PLANS_AND_SECTIONS.tiff
546 KB
 059
 A401
EXTERIOR DETAILS BASE BID
059-A401_EXTERIOR_DETAILS_BASE_BID.tiff
797 KB
 060
 A402
INTERIOR DETAILS ALTERNATE 1
060-A402_INTERIOR_DETAILS_ALTERNATE_1.tiff
617 KB
 061
 A403
ROOF DETAILS BASE BID
061-A403_ROOF_DETAILS_BASE_BID.tiff
728 KB
 062
 A501
DOOR OPENINGS AND ENTRANCES
062-A501_DOOR_OPENINGS_AND_ENTRANCES.tiff
851 KB
 063
 A502
WINDOWS STOREFRONTS CURTAINWALLS
063-A502_WINDOWS_STOREFRONTS_CURTAINWALLS.tiff
508 KB
 064
 A600
FINISH LEGEND SCHEDULE & DETAILS
064-A600_FINISH_LEGEND_SCHEDULE_&_DETAILS.tiff
656 KB
 065
 A601
FINISH PLANS BASE BID
065-A601_FINISH_PLANS_BASE_BID.tiff
997 KB
 066
 A602
FINISH PLANS ALTERNATES
066-A602_FINISH_PLANS_ALTERNATES.tiff
1001 KB
 067
 A701
ENLARGED PLANS AND INTERIOR ELEVATIONS
067-A701_ENLARGED_PLANS_AND_INTERIOR_ELEVATIONS.tiff
650 KB
 068
 A702
INTERIOR ELEVATIONS MULTIPURPOSE
068-A702_INTERIOR_ELEVATIONS_MULTIPURPOSE.tiff
729 KB
 069
 A703
ENLARGED PLAN & ELEVATIONS ALTERNATE 2
069-A703_ENLARGED_PLAN_&_ELEVATIONS_ALTERNATE_2.tiff
683 KB
 070
 A704
ENLARGED PLANS & ELEVATIONS ALTERNATE 2
070-A704_ENLARGED_PLANS_&_ELEVATIONS_ALTERNATE_2.tiff
861 KB
 071
 A705
INTERIOR ELEVATIONS ALTERNATE 2
071-A705_INTERIOR_ELEVATIONS_ALTERNATE_2.tiff
687 KB
 072
 A706
INTERIOR ELEVATIONS ALTERNATE 2
072-A706_INTERIOR_ELEVATIONS_ALTERNATE_2.tiff
517 KB
 073
 A801
MILLWORK DETAILS & SCHEDULES
073-A801_MILLWORK_DETAILS_&_SCHEDULES.tiff
573 KB
 074
 A802
SIGNAGE FF&E MISC
074-A802_SIGNAGE_FF&E_MISC.tiff
559 KB
 075
 F001
GENERAL FIRE SPRINKLER
075-F001_GENERAL_FIRE_SPRINKLER.tiff
472 KB
 076
 FD101
OVERALL BASEMENT FIRE SPRINKLER DEMOLITION PLAN
076-FD101_OVERALL_BASEMENT_FIRE_SPRINKLER_DEMOLITION_PLAN.tiff
757 KB
 077
 FD102
OVERALL FIRST FLOOR FIRE SPRINKLER DEMOLITION PLAN
077-FD102_OVERALL_FIRST_FLOOR_FIRE_SPRINKLER_DEMOLITION_PLAN.tiff
724 KB
 078
 F101
OVERALL NEW ADDITION FIRE SPRINKLER NEW WORK PLAN BASE BID
078-F101_OVERALL_NEW_ADDITION_FIRE_SPRINKLER_NEW_WORK_PLAN_BASE_BID.tiff
615 KB
 079
 F102
OVERALL BASEMENT FIRE SPRINKLER NEW WORK PLAN ALTERNATE 1
079-F102_OVERALL_BASEMENT_FIRE_SPRINKLER_NEW_WORK_PLAN_ALTERNATE_1.tiff
779 KB
 080
 F103
OVERALL FIRST FLOOR FIRE SPRINKLER NEW WORK PLAN ALTERNATE 2
080-F103_OVERALL_FIRST_FLOOR_FIRE_SPRINKLER_NEW_WORK_PLAN_ALTERNATE_2.tiff
722 KB
 081
 F200
FIRE SPRINKLER SCHEDULES & DETAILS
081-F200_FIRE_SPRINKLER_SCHEDULES_&_DETAILS.tiff
605 KB
 082
 P001
GENERAL PLUMBING
082-P001_GENERAL_PLUMBING.tiff
554 KB
 083
 PD101
OVERALL BASEMENT PLUMBING DEMOLITION PLAN ALTERNATE 1
083-PD101_OVERALL_BASEMENT_PLUMBING_DEMOLITION_PLAN_ALTERNATE_1.tiff
615 KB
 084
 PD102
OVERALL FIRST FLOOR PLUMBING DEMOLITION PLAN ALTERNATE 2
084-PD102_OVERALL_FIRST_FLOOR_PLUMBING_DEMOLITION_PLAN_ALTERNATE_2.tiff
698 KB
 085
 P101
OVERALL NEW ADDITION PLUMBING PLAN BASE BID
085-P101_OVERALL_NEW_ADDITION_PLUMBING_PLAN_BASE_BID.tiff
729 KB
 086
 P102
OVERALL BASEMENT PLUMBING NEW WORK ALTERNATE 1
086-P102_OVERALL_BASEMENT_PLUMBING_NEW_WORK_ALTERNATE_1.tiff
700 KB
 087
 P103
OVERALL FIRST FLOOR PLUMBING NEW WORK ALTERNATE 2
087-P103_OVERALL_FIRST_FLOOR_PLUMBING_NEW_WORK_ALTERNATE_2.tiff
620 KB
 088
 P104
OVERALL NEW ADDITION MECHANICAL ROOF PLAN BASE BID
088-P104_OVERALL_NEW_ADDITION_MECHANICAL_ROOF_PLAN_BASE_BID.tiff
556 KB
 089
 P111
ENLARGED PLUMBING NEW WORK
089-P111_ENLARGED_PLUMBING_NEW_WORK.tiff
664 KB
 090
 P112
ENLARGED FIRST FLOOR PLUMBING NEW WORK ALTERNATE 2
090-P112_ENLARGED_FIRST_FLOOR_PLUMBING_NEW_WORK_ALTERNATE_2.tiff
727 KB
 091
 P113
ENLARGED FIRST FLOOR PLUMBING NEW WORK PLANS ALTERNATE 2
091-P113_ENLARGED_FIRST_FLOOR_PLUMBING_NEW_WORK_PLANS_ALTERNATE_2.tiff
658 KB
 092
 P200
PLUMBING SCHEDULES & DETAILS
092-P200_PLUMBING_SCHEDULES_&_DETAILS.tiff
520 KB
 093
 P300
PLUMBING DETAILS
093-P300_PLUMBING_DETAILS.tiff
673 KB
 094
 M101
GENERAL HVAC
094-M101_GENERAL_HVAC.tiff
555 KB
 095
 MD101
OVERALL BASEMENT HVAC DEMOLITION PLAN ALTERNATE 1
095-MD101_OVERALL_BASEMENT_HVAC_DEMOLITION_PLAN_ALTERNATE_1.tiff
678 KB
 096
 MD102
OVERALL FIRST FLOOR HVAC DEMOLITION PLAN ALTERNATE 2
096-MD102_OVERALL_FIRST_FLOOR_HVAC_DEMOLITION_PLAN_ALTERNATE_2.tiff
717 KB
 097
 M101
GENERAL NEW ADDITION HVAC NEW WORK PLAN BASE BID
097-M101_GENERAL_NEW_ADDITION_HVAC_NEW_WORK_PLAN_BASE_BID.tiff
668 KB
 098
 M102
OVERALL BASEMENT HVAC NEW WORK PLAN ALTERNATE 1
098-M102_OVERALL_BASEMENT_HVAC_NEW_WORK_PLAN_ALTERNATE_1.tiff
822 KB
 099
 M103
OVERALL FIRST FLOOR HVAC NEW WORK PLAN ALTERNATE 2
099-M103_OVERALL_FIRST_FLOOR_HVAC_NEW_WORK_PLAN_ALTERNATE_2.tiff
679 KB
 100
 M111
ENLARGED HVAC NEW WORK ALTERNATE 2
100-M111_ENLARGED_HVAC_NEW_WORK_ALTERNATE_2.tiff
809 KB
 101
 M200
HVAC SCHEDULES
101-M200_HVAC_SCHEDULES.tiff
567 KB
 102
 M201
HVAC SCHEDULES
102-M201_HVAC_SCHEDULES.tiff
624 KB
 103
 M300
HVAC DETAILS
103-M300_HVAC_DETAILS.tiff
626 KB
 104
 M301
HVAC DETAILS
104-M301_HVAC_DETAILS.tiff
690 KB
 105
 M302
HVAC DETAILS
105-M302_HVAC_DETAILS.tiff
612 KB
 106
 E0.0
ELECTRICAL LEGEND
106-E0.0_ELECTRICAL_LEGEND.tiff
703 KB
 107
 E0.1
ELECTRICAL DETAILS
107-E0.1_ELECTRICAL_DETAILS.tiff
739 KB
 108
 E0.2
ELECTRICAL DETAILS
108-E0.2_ELECTRICAL_DETAILS.tiff
1342 KB
 109
 E0.3
DEMOLITION SITE PLAN
109-E0.3_DEMOLITION_SITE_PLAN.tiff
570 KB
 110
 E0.4
RENOVATION SITE PLAN
110-E0.4_RENOVATION_SITE_PLAN.tiff
553 KB
 111
 ED1.0
DEMOLITION PLAN FIRST FLOOR
111-ED1.0_DEMOLITION_PLAN_FIRST_FLOOR.tiff
626 KB
 112
 ED1.1
DEMOLITION PLAN SECOND FLOOR
112-ED1.1_DEMOLITION_PLAN_SECOND_FLOOR.tiff
635 KB
 113
 E1.0
LIGHTING PLAN FIRST FLOOR
113-E1.0_LIGHTING_PLAN_FIRST_FLOOR.tiff
740 KB
 114
 E1.1
LIGHTING PLAN SECOND FLOOR
114-E1.1_LIGHTING_PLAN_SECOND_FLOOR.tiff
642 KB
 115
 E2.0
POWER PLAN FIRST FLOOR
115-E2.0_POWER_PLAN_FIRST_FLOOR.tiff
678 KB
 116
 E2.1
POWER PLAN SECOND FLOOR
116-E2.1_POWER_PLAN_SECOND_FLOOR.tiff
626 KB
 117
 E3.0
MECH AUX PLAN FIRST FLOOR
117-E3.0_MECH_AUX_PLAN_FIRST_FLOOR.tiff
676 KB
 118
 E3.1
MECH AUX PLAN SECOND FLOOR
118-E3.1_MECH_AUX_PLAN_SECOND_FLOOR.tiff
627 KB
 119
 E4.0
AUXILIARY PLAN FIRST FLOOR
119-E4.0_AUXILIARY_PLAN_FIRST_FLOOR.tiff
667 KB
 120
 E4.1
AUXILIARY PLAN SECOND FLOOR
120-E4.1_AUXILIARY_PLAN_SECOND_FLOOR.tiff
624 KB
 121
 E4.2
AUXILIARY PLAN ELEVATIONS
121-E4.2_AUXILIARY_PLAN_ELEVATIONS.tiff
531 KB
 122
 E4.3
AUXILIARY PLAN ELEVATIONS
122-E4.3_AUXILIARY_PLAN_ELEVATIONS.tiff
535 KB