Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
John W. Boddie House Interior Renovations Phase 1, Tougaloo College
Project consists of the first phase of the interior renovation of the John W. Boddie House, a designated Mississippi Landmark which is listed on the National Register of Historic Places and located on the campus of Tougaloo College in Tougaloo, Mississippi. Work includes limited sitework to provide water, sewer, and electric utilities; limited repairs to exterior finishes; a new concrete elevator pit on helical piles; interior wood framing; gypsum wall board and shaft wall; HVAC systems; plumbing piping and rough-ins; automatic fire sprinkler system; and electrical, communication, and security systems and rough-ins.
Place Order
#
Sheet #
Sheet Name
Image Name (Click To View)
File Size
001
TITLE
SHEET SCOPE DESCRIPTION & GENERAL NOTES
001-TITLE_SHEET_SCOPE_DESCRIPTION_&_GENERAL_NOTES.tiff
828 KB
002
AS1.0
ARCHITECTURAL SITE PLAN & DETAILS
002-AS1.0_ARCHITECTURAL_SITE_PLAN_&_DETAILS.tiff
948 KB
003
AS1.1
SITE DETAILS
003-AS1.1_SITE_DETAILS.tiff
800 KB
004
A1.0
FOUNDATION CRAWL SPACE PLAN & DETAILS
004-A1.0_FOUNDATION_CRAWL_SPACE_PLAN_&_DETAILS.tiff
794 KB
005
A1.1
FIRST FLOOR FRAMING PLAN & DETAILS
005-A1.1_FIRST_FLOOR_FRAMING_PLAN_&_DETAILS.tiff
706 KB
006
A1.2
FIRST FLOOR PLAN & FINISH SCHEDULE
006-A1.2_FIRST_FLOOR_PLAN_&_FINISH_SCHEDULE.tiff
819 KB
007
A1.3
SECOND FLOOR PLAN & FINISH SCHEDULE
007-A1.3_SECOND_FLOOR_PLAN_&_FINISH_SCHEDULE.tiff
788 KB
008
A1.4
ROOF & TOWER ROOM FLOOR PLAN & FINISH SCHEDULE
008-A1.4_ROOF_&_TOWER_ROOM_FLOOR_PLAN_&_FINISH_SCHEDULE.tiff
716 KB
009
A1.5
FIRST FLOOR RCP
009-A1.5_FIRST_FLOOR_RCP.tiff
698 KB
010
A1.6
SECOND FLOOR RCP
010-A1.6_SECOND_FLOOR_RCP.tiff
592 KB
011
A2.0
ELEVATIONS & DETAILS
011-A2.0_ELEVATIONS_&_DETAILS.tiff
827 KB
012
A2.1
ELEVATIONS & DETAILS
012-A2.1_ELEVATIONS_&_DETAILS.tiff
759 KB
013
A3.0
BUILDING SECTIONS & DETAILS
013-A3.0_BUILDING_SECTIONS_&_DETAILS.tiff
896 KB
014
A4.0
CHIMNEY VENT CAP DETAILS
014-A4.0_CHIMNEY_VENT_CAP_DETAILS.tiff
729 KB
015
A4.1
MISCELLANEOUS DETAILS
015-A4.1_MISCELLANEOUS_DETAILS.tiff
662 KB
016
A4.2
WEST ENTRANCE ELEVATIONS & DETAILS
016-A4.2_WEST_ENTRANCE_ELEVATIONS_&_DETAILS.tiff
687 KB
017
A4.3
ENLARGED PLANS & ELEVATIONS
017-A4.3_ENLARGED_PLANS_&_ELEVATIONS.tiff
784 KB
018
A5.0
DOOR SCHEDULE ELEVATIONS & DETAILS
018-A5.0_DOOR_SCHEDULE_ELEVATIONS_&_DETAILS.tiff
831 KB
019
S001
STRUCTURAL GENERAL NOTES
019-S001_STRUCTURAL_GENERAL_NOTES.tiff
562 KB
020
S111
ELEVATOR FOUNDATION & FIRST FLOOR FRAMING PLAN & DETAILS
020-S111_ELEVATOR_FOUNDATION_&_FIRST_FLOOR_FRAMING_PLAN_&_DETAILS.tiff
603 KB
021
S112
FIRST FLOOR MEZZANINE FRAMING PLANS & DETAILS
021-S112_FIRST_FLOOR_MEZZANINE_FRAMING_PLANS_&_DETAILS.tiff
1122 KB
022
S113
SECOND FLOOR MEZZANINE FRAMING PLANS & DETAILS
022-S113_SECOND_FLOOR_MEZZANINE_FRAMING_PLANS_&_DETAILS.tiff
610 KB
023
P001
ABBREVIATIONS LEGENDS GENERAL NOTES
023-P001_ABBREVIATIONS_LEGENDS_GENERAL_NOTES.tiff
706 KB
024
PS100
SITE PLAN PLUMBING (BASE BID)
024-PS100_SITE_PLAN_PLUMBING_(BASE_BID).tiff
770 KB
025
FP101
CRAWL SPACE FIRST & SECOND FLOOR PLANS FIRE PROTECTION (BASE BID)
025-FP101_CRAWL_SPACE_FIRST_&_SECOND_FLOOR_PLANS_FIRE_PROTECTION_(BASE_BID).tiff
613 KB
026
FP501
FIRE PROTECTION DETAILS
026-FP501_FIRE_PROTECTION_DETAILS.tiff
533 KB
027
P101
CRAWK SPACE FIRST & SECOND FLOOR PLANS PLUMBING SANITARY (BASE BID)
027-P101_CRAWK_SPACE_FIRST_&_SECOND_FLOOR_PLANS_PLUMBING_SANITARY_(BASE_BID).tiff
660 KB
028
P102
CRAWL SPACE FIRST & SECOND FLOOR PLANS PLUMBING SUPPLY (BASE BID)
028-P102_CRAWL_SPACE_FIRST_&_SECOND_FLOOR_PLANS_PLUMBING_SUPPLY_(BASE_BID).tiff
615 KB
029
P103
CRAWL SPACE FIRST & SECOND FLOOR PLANS PLUMBING SANITARY (BASE BID)
029-P103_CRAWL_SPACE_FIRST_&_SECOND_FLOOR_PLANS_PLUMBING_SANITARY_(BASE_BID).tiff
683 KB
030
P501
PLUMBING DETAILS
030-P501_PLUMBING_DETAILS.tiff
647 KB
031
P502-PLUMBING
SCHEDULES & RISERS
031-P502-PLUMBING_SCHEDULES_&_RISERS.tiff
538 KB
032
M001
MECHANICAL LEGEND & ABBREVIATIONS
032-M001_MECHANICAL_LEGEND_&_ABBREVIATIONS.tiff
808 KB
033
M101
CRAWL SPACE PLAN HVAC (BASE BID)
033-M101_CRAWL_SPACE_PLAN_HVAC_(BASE_BID).tiff
541 KB
034
M102
FIRST FLOOR PLAN HVAC (BASE BID)
034-M102_FIRST_FLOOR_PLAN_HVAC_(BASE_BID).tiff
641 KB
035
M103
SECOND FLOOR PLAN HVAC (BASE BID)
035-M103_SECOND_FLOOR_PLAN_HVAC_(BASE_BID).tiff
649 KB
036
M104
CRAWL SPACE PLAN HVAC (ALTERNATE #1 & #2)
036-M104_CRAWL_SPACE_PLAN_HVAC_(ALTERNATE_#1_&_#2).tiff
537 KB
037
M105
FIRST FLOOR PLAN HVAC (ALTERNATE # & #2)
037-M105_FIRST_FLOOR_PLAN_HVAC_(ALTERNATE_#_&_#2).tiff
611 KB
038
M106
SECOND FLOOR PLAN HVAC (ALTERNATE #1 & #2)
038-M106_SECOND_FLOOR_PLAN_HVAC_(ALTERNATE_#1_&_#2).tiff
607 KB
039
M201
CRAWL SPACE PLAN HVAC PIPING (BASE BID)
039-M201_CRAWL_SPACE_PLAN_HVAC_PIPING_(BASE_BID).tiff
546 KB
040
M202
FIRST FLOOR PLAN HVAC PIPING (BASE BID)
040-M202_FIRST_FLOOR_PLAN_HVAC_PIPING_(BASE_BID).tiff
601 KB
041
M203
SECOND FLOOR PLAN HVAC PIPING (BASE BID)
041-M203_SECOND_FLOOR_PLAN_HVAC_PIPING_(BASE_BID).tiff
575 KB
042
M204
CRAWL SPACE PLAN HVAC PIPING (ALTERNATE #1 & #2)
042-M204_CRAWL_SPACE_PLAN_HVAC_PIPING_(ALTERNATE_#1_&_#2).tiff
562 KB
043
M205
FIRST FLOOR PLAN HVAC PIPING (ALTERNATE #1)
043-M205_FIRST_FLOOR_PLAN_HVAC_PIPING_(ALTERNATE_#1).tiff
627 KB
044
M206
SECOND FLOOR PLAN HVAC PIPING (ALTERNATE #1)
044-M206_SECOND_FLOOR_PLAN_HVAC_PIPING_(ALTERNATE_#1).tiff
617 KB
045
M501
HVAC DETAILS
045-M501_HVAC_DETAILS.tiff
596 KB
046
M601
HVAC SCHEDULES (BASE BID)
046-M601_HVAC_SCHEDULES_(BASE_BID).tiff
599 KB
047
M602
HVAC SCHEDULES (ALTERNATE)
047-M602_HVAC_SCHEDULES_(ALTERNATE).tiff
759 KB
048
M603
HVAC SCHEDULES (ALTERNATE)
048-M603_HVAC_SCHEDULES_(ALTERNATE).tiff
532 KB
049
M701
HVAC CONTROLS
049-M701_HVAC_CONTROLS.tiff
803 KB
050
M702
HVAC CONTROLS
050-M702_HVAC_CONTROLS.tiff
555 KB
051
M801
HVAC PIPING SCHEMATIC
051-M801_HVAC_PIPING_SCHEMATIC.tiff
487 KB
052
E000
ELECTRICAL LEGEND GENERAL NOTES & DIAGRAMS
052-E000_ELECTRICAL_LEGEND_GENERAL_NOTES_&_DIAGRAMS.tiff
347 KB
053
E001
ELECTRICAL PANEL SCHEDULES & DETAILS
053-E001_ELECTRICAL_PANEL_SCHEDULES_&_DETAILS.tiff
1450 KB
054
E002
MECHANICAL EQUIPMENT SCHEDULE & LIGHTING FIXTURE SCHEDULE
054-E002_MECHANICAL_EQUIPMENT_SCHEDULE_&_LIGHTING_FIXTURE_SCHEDULE.tiff
1378 KB
055
E003
SITE ELECTRICAL PLAN
055-E003_SITE_ELECTRICAL_PLAN.tiff
295 KB
056
E100
CRAWL SPACE LIGHTING PLAN
056-E100_CRAWL_SPACE_LIGHTING_PLAN.tiff
251 KB
057
E101
FIRST FLOOR PLAN LIGHTING PLAN
057-E101_FIRST_FLOOR_PLAN_LIGHTING_PLAN.tiff
320 KB
058
E102
SECOND FLOOR LIGHTING PLAN
058-E102_SECOND_FLOOR_LIGHTING_PLAN.tiff
298 KB
059
E200
CRAWL SPACE POWER PLAN
059-E200_CRAWL_SPACE_POWER_PLAN.tiff
258 KB
060
E201
FIRST FLOOR POWER PLAN
060-E201_FIRST_FLOOR_POWER_PLAN.tiff
389 KB
061
E202
SECOND FLOOR POWER PLAN
061-E202_SECOND_FLOOR_POWER_PLAN.tiff
311 KB
062
E203
TOWER POWER PLAN
062-E203_TOWER_POWER_PLAN.tiff
216 KB
063
E300
CRAWL SPACE MECHANICAL CONNECTIONS & AUXILIARY PLAN
063-E300_CRAWL_SPACE_MECHANICAL_CONNECTIONS_&_AUXILIARY_PLAN.tiff
256 KB
064
E301
FIRST FLOOR MECHANICAL CONNECTIONS & AUXILIARY PLAN
064-E301_FIRST_FLOOR_MECHANICAL_CONNECTIONS_&_AUXILIARY_PLAN.tiff
327 KB
065
E302
SECOND FLOOR MECHANICAL CONNECTIONS & AUXILIARY PLAN
065-E302_SECOND_FLOOR_MECHANICAL_CONNECTIONS_&_AUXILIARY_PLAN.tiff
297 KB