Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
GS# 346-009 Facility Improvements Mississippi Sports Hall of Fame and Museum
RENOVATE EXISTING LOBBY, GIFT SHOP, AND INDUCTEE DISPLAY WALL. THIS WORK WILL INCLUDE THE DEMOLITION OF THE EXISTING "ORANGE" WALL, FLOORING AND FINISHES. NEW WORK WILL INCLUDE NEW ENTRY DISPLAYS, GIFTSHOP MERCHANDISING, LIGHTING, AND RELOCATION OF EXISTING LOGO SIGNAGE AND EXHIBITS, AND FINISHES. EXISTING "ANALOG" LIGHTING CONTROL SYSTEM FOR THE MUSEUM WILL BE REPLACED WITH A NEW DIGITAL LIGHTING CONTROL PACKAGE. THE LIGHTING CONTROL PACKAGE WILL BE PROGRAMMED FOR STAFF USE AND CONTROL. REPLACE EXISTING HIGH-BAY LIGHTING WITH LED LAMPS TO MATCH EXISTING LIGHTING OUTPUT. DEMOLISH TWO EXISTING TAPERED PYLONS IN EXISTING COURTYARD, REPAIR/REPLACE EXISTING PLAZA CONCRETE, AND RELOCATE EXISTING DONOR BRICK AS REQUIRED. INSTALL NEW PEDESTRIAN PLAZA LIGHTING AND LIGHTS FOR BUILDING SIGNAGE. INSTALL NEW GRAPHIC WRAP AT EXISTING STOREFRONT AND INSTALL NEW "WALL WASHER" LIGHTING IN EXISTING SOFFIT TO LIGHT EXTERIOR. RENOVATE EXISTING TOILETS. THIS WORK WILL INCLUDE NEW FINISH TILE, CEILING, TOILET PARTITIONS, TOILET FIXTURES, AND LAVATORIES.
Place Order
#
Sheet #
Sheet Name
Image Name (Click To View)
File Size
001
R000
COVER SHEET
001-R000_COVER_SHEET.tiff
5821 KB
002
R100
PROJECT INFO
002-R100_PROJECT_INFO.tiff
3271 KB
003
C001
CIVIL GENERAL NOTES
003-C001_CIVIL_GENERAL_NOTES.tiff
618 KB
004
C101
EROSION CONTROL PLAN
004-C101_EROSION_CONTROL_PLAN.tiff
735 KB
005
C111
DEMOLITION PLAN
005-C111_DEMOLITION_PLAN.tiff
775 KB
006
C121
SITE PLAN
006-C121_SITE_PLAN.tiff
705 KB
007
C131
GRADING PLAN
007-C131_GRADING_PLAN.tiff
709 KB
008
C201
CIVIL DETAILS
008-C201_CIVIL_DETAILS.tiff
661 KB
009
C202
CIVIL DETAILS
009-C202_CIVIL_DETAILS.tiff
589 KB
010
D100
DEMOLITION PLAN
010-D100_DEMOLITION_PLAN.tiff
2798 KB
011
D101
ALT 1 DEMO PLAN
011-D101_ALT_1_DEMO_PLAN.tiff
2545 KB
012
D102
ALT 2 & 3 DEMO PLAN
012-D102_ALT_2_&_3_DEMO_PLAN.tiff
1110 KB
013
D103
ALT 4 & 5 DEMO PLAN
013-D103_ALT_4_&_5_DEMO_PLAN.tiff
1489 KB
014
D1065
DEMO EXTERIOR ELEVATIONS
014-D1065_DEMO_EXTERIOR_ELEVATIONS.tiff
995 KB
015
A100
SITE ARCHITECTURE
015-A100_SITE_ARCHITECTURE.tiff
987 KB
016
A101
FIRST FLOOR PLAN
016-A101_FIRST_FLOOR_PLAN.tiff
901 KB
017
A102
SECOND FLOOR PLAN
017-A102_SECOND_FLOOR_PLAN.tiff
681 KB
018
A103
ROOF PLAN
018-A103_ROOF_PLAN.tiff
709 KB
019
A104
FIRST FLOOR RCP
019-A104_FIRST_FLOOR_RCP.tiff
850 KB
020
A201
EXTERIOR ELEVATIONS
020-A201_EXTERIOR_ELEVATIONS.tiff
892 KB
021
A301
WALL SECTIONS
021-A301_WALL_SECTIONS.tiff
847 KB
022
A302
WALL SECTIONS
022-A302_WALL_SECTIONS.tiff
876 KB
023
A303
WALL SECTIONS
023-A303_WALL_SECTIONS.tiff
712 KB
024
A304
WALL SECTIONS
024-A304_WALL_SECTIONS.tiff
785 KB
025
A401
PLAN & SECTION DETAILS
025-A401_PLAN_&_SECTION_DETAILS.tiff
701 KB
026
A500
DOOR SCHEDULE
026-A500_DOOR_SCHEDULE.tiff
576 KB
027
A601
PARTITIONS & FINISHES
027-A601_PARTITIONS_&_FINISHES.tiff
783 KB
028
A701
ENLARGED LOBBY GIFT SHOP PLAN
028-A701_ENLARGED_LOBBY_GIFT_SHOP_PLAN.tiff
784 KB
029
A702
ENLARGED BR PLAN & INT ELEV
029-A702_ENLARGED_BR_PLAN_&_INT_ELEV.tiff
862 KB
030
A703
ENLARGED OFFICE PLAN AND INT ELEV
030-A703_ENLARGED_OFFICE_PLAN_AND_INT_ELEV.tiff
711 KB
031
A705
INTERIOR ELEVATIONS & MILLWORK
031-A705_INTERIOR_ELEVATIONS_&_MILLWORK.tiff
862 KB
032
A706
INTERIOR ELEVATIONS & MILLWORK
032-A706_INTERIOR_ELEVATIONS_&_MILLWORK.tiff
821 KB
033
A707
INTERIOR ELEVATIONS & MILLWORK
033-A707_INTERIOR_ELEVATIONS_&_MILLWORK.tiff
764 KB
034
A708
INTERIOR ELEVAITONS & MILLWORK
034-A708_INTERIOR_ELEVAITONS_&_MILLWORK.tiff
712 KB
035
A709
INTERIOR ELEVATIONS & MILLWORK
035-A709_INTERIOR_ELEVATIONS_&_MILLWORK.tiff
731 KB
036
A710
INTERIOR ELEVATIONS & MILLWORK
036-A710_INTERIOR_ELEVATIONS_&_MILLWORK.tiff
805 KB
037
A800
FLOOR FINISH PLANS
037-A800_FLOOR_FINISH_PLANS.tiff
772 KB
038
S001
STRUCTURAL GENERAL NOTES
038-S001_STRUCTURAL_GENERAL_NOTES.tiff
297 KB
039
S002
STRUCTURAL QUALITY ASSURANCE PLAN
039-S002_STRUCTURAL_QUALITY_ASSURANCE_PLAN.tiff
335 KB
040
S101
SIGNAGE PLAN
040-S101_SIGNAGE_PLAN.tiff
279 KB
041
S102
ROOF FRAMING PLAN
041-S102_ROOF_FRAMING_PLAN.tiff
275 KB
042
S103
SIGNAGE ELEVATIONS
042-S103_SIGNAGE_ELEVATIONS.tiff
283 KB
043
S201
FOUNDATION DETAILS
043-S201_FOUNDATION_DETAILS.tiff
334 KB
044
S301
CURTAIN WALL DETAILS
044-S301_CURTAIN_WALL_DETAILS.tiff
240 KB
045
S302
PARAPET FRAMING DETAILS
045-S302_PARAPET_FRAMING_DETAILS.tiff
298 KB
046
M001
MECHANICAL LEGEND AND ABBREVIATIONS
046-M001_MECHANICAL_LEGEND_AND_ABBREVIATIONS.tiff
733 KB
047
M101
FIRST FLOOR PLAN MECHANICAL
047-M101_FIRST_FLOOR_PLAN_MECHANICAL.tiff
600 KB
048
M401
ENLARGED SCALE BOILER ROOM MECHANICAL
048-M401_ENLARGED_SCALE_BOILER_ROOM_MECHANICAL.tiff
539 KB
049
M501
MECHANICAL DETAILS AND SCHEDULES
049-M501_MECHANICAL_DETAILS_AND_SCHEDULES.tiff
520 KB
050
M701
MECHANICAL CONTROL SCHEMATICS
050-M701_MECHANICAL_CONTROL_SCHEMATICS.tiff
807 KB
051
M702
MECHANICAL CONTROL SCHEMATICS
051-M702_MECHANICAL_CONTROL_SCHEMATICS.tiff
580 KB
052
M703
MECHANICAL CONTROL SCHEMATICS
052-M703_MECHANICAL_CONTROL_SCHEMATICS.tiff
570 KB
053
M704
MECHANICAL CONTROL SCHEMATICS
053-M704_MECHANICAL_CONTROL_SCHEMATICS.tiff
555 KB
054
M705
MECHANICAL CONTROL SCHEMATICS
054-M705_MECHANICAL_CONTROL_SCHEMATICS.tiff
577 KB
055
M706
MECHANICAL CONTROL SCHEMATICS
055-M706_MECHANICAL_CONTROL_SCHEMATICS.tiff
572 KB
056
FP101
FIRST FLOR PLAN FIRE PROTECTION AND PLUMBING
056-FP101_FIRST_FLOR_PLAN_FIRE_PROTECTION_AND_PLUMBING.tiff
649 KB
057
FP102
SECOND FLOOR PLAN FIRE PROTECTION AND PLUMBING
057-FP102_SECOND_FLOOR_PLAN_FIRE_PROTECTION_AND_PLUMBING.tiff
605 KB
058
E000
LEGEND SHEET
058-E000_LEGEND_SHEET.tiff
675 KB
059
E100
LIGHTING PLAN FIRST FLOOR
059-E100_LIGHTING_PLAN_FIRST_FLOOR.tiff
738 KB
060
E101
LIGHTING PLAN SECOND FLOOR
060-E101_LIGHTING_PLAN_SECOND_FLOOR.tiff
582 KB
061
E102
LIGHTING DETAILS
061-E102_LIGHTING_DETAILS.tiff
573 KB
062
E103
EXTERIOR LIGHTING PLAN
062-E103_EXTERIOR_LIGHTING_PLAN.tiff
548 KB
063
E104
LIGHTING CONTROL DETAILS
063-E104_LIGHTING_CONTROL_DETAILS.tiff
519 KB
064
E105
RELAY PANEL SCHEDULES
064-E105_RELAY_PANEL_SCHEDULES.tiff
924 KB
065
E200
POWER PLAN FIRST FLOOR
065-E200_POWER_PLAN_FIRST_FLOOR.tiff
674 KB
066
E201
POWER PLAN SECOND FLOOR
066-E201_POWER_PLAN_SECOND_FLOOR.tiff
556 KB
067
ED100
DEMOLITON PLAN FIRST FLOOR
067-ED100_DEMOLITON_PLAN_FIRST_FLOOR.tiff
788 KB
068
ED101
DEMOLITION PLAN SECOND FLOOR
068-ED101_DEMOLITION_PLAN_SECOND_FLOOR.tiff
595 KB