Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
HEERF III Prevention Engineering Intervention (Touchless Doors) (Rankin Campus) Hinds Community College

Project consists of demolition and replacement of various entry doors to each building on the Rankin Campus including the Greenfield Road Campus and replacement with touchless sliding or swinging door units and operators. Project also includes required electrical work, ceiling and drywall work as needed to get power to the automatic units. Project includes interior and exterior painting of adjacent hollow metal doors and frames at the entrances.
           Place Order 
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 COVER
SHEET
001-COVER_SHEET.tiff
656 KB
 002
 G001
ABBREVIATIONS SYMBOLS CODE NOTES INDEX OF DRAWINGS
002-G001_ABBREVIATIONS_SYMBOLS_CODE_NOTES_INDEX_OF_DRAWINGS.tiff
11365 KB
 003
 A101
RENOVATION PLAN NOTES AND PHOTS ACADEMIC BUILDING
003-A101_RENOVATION_PLAN_NOTES_AND_PHOTS_ACADEMIC_BUILDING.tiff
5581 KB
 004
 A101.1
PHOTOS ACADEMIC BUILDING
004-A101.1_PHOTOS_ACADEMIC_BUILDING.tiff
4736 KB
 005
 A102
RENOVATION PLAN NOTES AND PHOTOS CAREER TECHNICAL CENTER
005-A102_RENOVATION_PLAN_NOTES_AND_PHOTOS_CAREER_TECHNICAL_CENTER.tiff
5044 KB
 006
 A103
RENOVATION PLAN NOTES AND PHOTOS CLYDE MUSE CENTER
006-A103_RENOVATION_PLAN_NOTES_AND_PHOTOS_CLYDE_MUSE_CENTER.tiff
5053 KB
 007
 A104
RENOVATION PLAN NOTES AND PHOTOS EARLY CHILDHOOD EDUCATIONAL CENTER
007-A104_RENOVATION_PLAN_NOTES_AND_PHOTOS_EARLY_CHILDHOOD_EDUCATIONAL_CENTER.tiff
1996 KB
 008
 A105
RENOVATION PLAN NOTES AND PHOTOS G
008-A105_RENOVATION_PLAN_NOTES_AND_PHOTOS_G.W._BUILDING_1ST_FLOOR.tiff
6296 KB
 009
 A106
RENOVATION PLAN NOTES AND PHOTOS G
009-A106_RENOVATION_PLAN_NOTES_AND_PHOTOS_G.W._BUILDING_2ND_FLOOR.tiff
5878 KB
 010
 A107
RENOVATION PLAN NOTES AND PHOTOS STUDENT SERVICES BUILDING
010-A107_RENOVATION_PLAN_NOTES_AND_PHOTOS_STUDENT_SERVICES_BUILDING.tiff
2747 KB
 011
 A108
RENOVATION PLAN NOTES AND PHOTOS GREENFIELD BUILDING
011-A108_RENOVATION_PLAN_NOTES_AND_PHOTOS_GREENFIELD_BUILDING.tiff
2640 KB
 012
 A108.1
PHOTOS GREENFIELD BUILDING
012-A108.1_PHOTOS_GREENFIELD_BUILDING.tiff
7231 KB
 013
 A201
BI PARTING DOORS DOOR OPERATOR DETAILS
013-A201_BI_PARTING_DOORS_DOOR_OPERATOR_DETAILS.tiff
686 KB