Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
HEERF III Prevention Engineering Intervention (Touchless Doors) (Rankin Campus) Hinds Community College
Project consists of demolition and replacement of various entry doors to each building on the Rankin Campus including the Greenfield Road Campus and replacement with touchless sliding or swinging door units and operators. Project also includes required electrical work, ceiling and drywall work as needed to get power to the automatic units. Project includes interior and exterior painting of adjacent hollow metal doors and frames at the entrances.
Place Order
Name
Spec Sheet(Click to View)
File Size / Approx. Download Time (56k Modem)
Description
DPR Viewable Specs
DPR_Viewable_Specs.pdf
2252 KB / 5m 14s