Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Emilia Resources Production Area Renovations

PROJECT DESCRIPTION PRODUCTION AREA RENOVATIONS The following is the scope for the referenced project currently being bid. Funding always being an issue, especially in the pandemic times that are currently being observed, the following Work is anticipated as part of the project - depending on funding abilities. Primary focus regardless of the project will be to update and upgrade the existing electrical system to ensure code compliance for Life Safety. See electrical writeup. • • Work for Compliance versus expansion of the existing facility is the primary focus of the project during this phase. All ceilings will be replaced with suspended system utilizing vinyl covered gypsum board to allow for cleaning. Lighting will be replaced with LED fixtures for higher lighting levels throughout the facility. • Work included in the" 1 000" building consists of removing prior floor coatings and subsequent installation of concrete hardener and sealer for a dust and water proof flooring surface in the packaging areas. This flooring system shall be utilized in all other areas except the production suites. Stainless steel base with protective steel at all walls. • Removal of partitions between packaging areas to provide maximum flexibility for packaging lines. Current electrical "drops" will be eliminated utilizing flexible electrical bus system at ceiling. • Existing FRP wall covering will be repaired/replaced in packaging areas. • In Production Areas: • Removal of existing floor coatings and subsequent installation of epoxy floor coatings with integrated cove base. Removal of existing FRP panels and will be replaced with High-Impact Moisture resistant Gypsum Board to provide overhang at base to minimize/eliminate horizontal dust ledges. Wall finish shall be epoxy paint allowing for proper patchinglrepair due to damage or equipment replacement. .:. Floor drains shall be repaired/replaced with heat resistant waste piping and connected to proper oil separator to allow for cooling and settling of heavy product components. • Installation of exhaust system and upgrade of supply system for HV AC to provide for positive pressure to minimize air contamination in conjunction with existing or replacement high-speed door systems. • Renovation of wash area includes replacement of existing FRP on CMU with PVC wall panel system to eliminate panel joints for extended cleanliness.
           Place Order 
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 T1.0
TITLE SHEET
001-T1.0_TITLE_SHEET.tiff
490 KB
 002
 D1.0
FACILITY FLOOR PLAN SELECTIVE DEMOLITION
002-D1.0_FACILITY_FLOOR_PLAN_SELECTIVE_DEMOLITION.tiff
464 KB
 003
 A1.0
FACO;OTU FLOOR PLAN
003-A1.0_FACO;OTU_FLOOR_PLAN.tiff
483 KB
 004
 A1.1
FACILITY FLOOR PLAN & DETAILS
004-A1.1_FACILITY_FLOOR_PLAN_&_DETAILS.tiff
504 KB
 005
 A1.2
PARTIAL REFLECTED CEILING PLAN
005-A1.2_PARTIAL_REFLECTED_CEILING_PLAN.tiff
593 KB
 006
 A1.3
SCHEDULES & DETAILS
006-A1.3_SCHEDULES_&_DETAILS.tiff
568 KB
 007
 A2.0
WALL SECTIONS
007-A2.0_WALL_SECTIONS.tiff
522 KB
 008
 A3.0
PARTIAL FLOOR PLAN HVAC
008-A3.0_PARTIAL_FLOOR_PLAN_HVAC.tiff
478 KB
 009
 A3.1
PARTIAL FLOOR PLAN PLUMBING
009-A3.1_PARTIAL_FLOOR_PLAN_PLUMBING.tiff
483 KB
 010
 ADA1.0
ACCESSIBILITY REQUIREMENTS
010-ADA1.0_ACCESSIBILITY_REQUIREMENTS.tiff
509 KB
 011
 E0.1
ELECTRICAL LEGEND
011-E0.1_ELECTRICAL_LEGEND.tiff
260 KB
 012
 E0.2
ONE LINE DIAGRAM
012-E0.2_ONE_LINE_DIAGRAM.tiff
222 KB
 013
 E0.3
POWER CONNECTION SCHEDULES
013-E0.3_POWER_CONNECTION_SCHEDULES.tiff
250 KB
 014
 E0.4
PANEL SCHEDULES
014-E0.4_PANEL_SCHEDULES.tiff
299 KB
 015
 E0.5
PANEL SCHEDULES
015-E0.5_PANEL_SCHEDULES.tiff
222 KB
 016
 E0.6
GROUNDING DETAILS & PLAN
016-E0.6_GROUNDING_DETAILS_&_PLAN.tiff
247 KB
 017
 ED0.1
FLOOR PLAN ELECTRICAL DEMOLITION
017-ED0.1_FLOOR_PLAN_ELECTRICAL_DEMOLITION.tiff
232 KB
 018
 E1.1
PARTIAL FLOOR PLAN LIGHTING
018-E1.1_PARTIAL_FLOOR_PLAN_LIGHTING.tiff
269 KB
 019
 E2.1
PARTIAL FLOOR PLAN POWER
019-E2.1_PARTIAL_FLOOR_PLAN_POWER.tiff
275 KB
 020
 E3.1
PARTIAL FLOOR PLAN FIRE ALARM COMMUNICATIONS
020-E3.1_PARTIAL_FLOOR_PLAN_FIRE_ALARM_COMMUNICATIONS.tiff
229 KB