Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
New Repair Shop and Blast/Paint Facility for American Industrial Transport

Forcum Lannom Contractors, LLC, on behalf of American Industrial Transport (AITX), is requesting proposals/bids to construct two (2) new buildings and the expansion of an existing rail storage yard at their facility in Brookhaven, MS. Both buildings will be pre-engineered metal structures with office/support areas. Work associated with the project consists of, but not limited to, the following: Demolition of an existing structure and miscellaneous site items , Earthwork/storm piping/erosion control/gravel base and paving/site utilities , Concrete foundations, slabs, pits, trenches, sidewalks, pads, paving , Masonry , Miscellaneous steel and work platforms , Carpentry and millwork/countertops , Insulation systems , Walk doors/overhead coiling doors/glass and glazing , Drywall and metal studs/acoustical ceilings/flooring/paint , Restroom specialties , Process related equipment: Blast and Paint Booths , Fall protection equipment , Pre-engineered metal building and erection , Bridge cranes/railcar transfer table , Fire protection , Plumbing , HVAC/Mechanical equipment , Electrical
           Place Order 
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 CV00
COVER SHEET
001-CV00_COVER_SHEET.tiff
523 KB
 002
 GC1.1B
GENERAL CODE INFORMATION
002-GC1.1B_GENERAL_CODE_INFORMATION.tiff
1066 KB
 003
 C1.1R
GENERAL CODE INFORMATION
003-C1.1R_GENERAL_CODE_INFORMATION.tiff
931 KB
 004
 GSL1.0
GENERAL SITE LOCATION PLAN
004-GSL1.0_GENERAL_SITE_LOCATION_PLAN.tiff
815 KB
 005
 C0.1
NOTES AND TYPICAL SITE DETAILS
005-C0.1_NOTES_AND_TYPICAL_SITE_DETAILS.tiff
874 KB
 006
 C0.2
TYPICAL SITE DETAILS
006-C0.2_TYPICAL_SITE_DETAILS.tiff
2174 KB
 007
 C1.0
OVERALL EXISTING CONDITIONS PLAN
007-C1.0_OVERALL_EXISTING_CONDITIONS_PLAN.tiff
651 KB
 008
 C1.1
PARTIAL EXISTING CONDITIONS PLAN
008-C1.1_PARTIAL_EXISTING_CONDITIONS_PLAN.tiff
637 KB
 009
 C1.2
OVERALL SITE DEMOLITON PLAN
009-C1.2_OVERALL_SITE_DEMOLITON_PLAN.tiff
640 KB
 010
 C1.3
SITE DEMOLITION PLAN EAST
010-C1.3_SITE_DEMOLITION_PLAN_EAST.tiff
636 KB
 011
 C1.4
SITE DEMOLITION PLAN WEST
011-C1.4_SITE_DEMOLITION_PLAN_WEST.tiff
646 KB
 012
 C2.0
OVERALL SITE LAYOUT PLAN
012-C2.0_OVERALL_SITE_LAYOUT_PLAN.tiff
753 KB
 013
 C2.1
PARTIAL SITE LAYOUT PLAN
013-C2.1_PARTIAL_SITE_LAYOUT_PLAN.tiff
826 KB
 014
 C2.2
PARTIAL SITE LAYOUT PLAN STORAGE RAIL EAST
014-C2.2_PARTIAL_SITE_LAYOUT_PLAN_STORAGE_RAIL_EAST.tiff
607 KB
 015
 C2.3
PARTIAL SITE LAYOUT PLAN WEST
015-C2.3_PARTIAL_SITE_LAYOUT_PLAN_WEST.tiff
641 KB
 016
 C3.0
OVERALL SITE GRADING PLAN
016-C3.0_OVERALL_SITE_GRADING_PLAN.tiff
879 KB
 017
 3.1
PARTIAL SITE GRADING PLAN
017-3.1_PARTIAL_SITE_GRADING_PLAN.tiff
957 KB
 018
 3.2
PARTIAL SITE GRADING PLAN STORAGE RAIL EAST
018-3.2_PARTIAL_SITE_GRADING_PLAN_STORAGE_RAIL_EAST.tiff
672 KB
 019
 C3.3
PARTIAL SITE GRADING PLAN WEST
019-C3.3_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
761 KB
 020
 C3.4
PARTIAL SITE GRADING PLAN WEST
020-C3.4_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
903 KB
 021
 C3.5
PARTIAL SITE GRADING PLAN WEST
021-C3.5_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
884 KB
 022
 C3.6
PARTIAL SITE GRADING PLAN WEST
022-C3.6_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
773 KB
 023
 C3.7
PARTIAL SITE GRADING PLAN WEST
023-C3.7_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
761 KB
 024
 C3.8
PARTIAL SITE GRADING PLAN WEST
024-C3.8_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
814 KB
 025
 C3.9
PARTIAL SITE GRADING PLAN WEST
025-C3.9_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
1078 KB
 026
 C3.10
PARTIAL SITE GRADING PLAN WEST
026-C3.10_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
985 KB
 027
 C3.11
PARTIAL SITE GRADING PLAN WEST
027-C3.11_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
1121 KB
 028
 C4.0
PARTIAL STORM WATER DRAINAGE PLAN
028-C4.0_PARTIAL_STORM_WATER_DRAINAGE_PLAN.tiff
977 KB
 029
 C4.1
PARTIAL STORM WATER DRAINAGE PLAN
029-C4.1_PARTIAL_STORM_WATER_DRAINAGE_PLAN.tiff
640 KB
 030
 C4.2
DRAINAGE STRUCTURES AND PIPE INDEX
030-C4.2_DRAINAGE_STRUCTURES_AND_PIPE_INDEX.tiff
973 KB
 031
 C5.0
RAIL ALIGNMENT LAYOUT INDEX
031-C5.0_RAIL_ALIGNMENT_LAYOUT_INDEX.tiff
732 KB
 032
 C5.1
RAIL ALIGNMENT LAYOUT
032-C5.1_RAIL_ALIGNMENT_LAYOUT.tiff
751 KB
 033
 C5.2
RAIL ALIGNMENT LAYOUT
033-C5.2_RAIL_ALIGNMENT_LAYOUT.tiff
649 KB
 034
 C5.3
RAIL ALIGNMENT LAYOUT
034-C5.3_RAIL_ALIGNMENT_LAYOUT.tiff
783 KB
 035
 C5.4
RAIL ALIGNMENT LAYOUT
035-C5.4_RAIL_ALIGNMENT_LAYOUT.tiff
848 KB
 036
 C5.5
RAIL ALIGNMENT DETAILS
036-C5.5_RAIL_ALIGNMENT_DETAILS.tiff
958 KB
 037
 EC1.2
EROSION CONTROL PLAN
037-EC1.2_EROSION_CONTROL_PLAN.tiff
914 KB
 038
 EC1.1
EROSION CONTROL PLAN
038-EC1.1_EROSION_CONTROL_PLAN.tiff
922 KB
 039
 EC1.2
EROSION CONTROL DETAILS
039-EC1.2_EROSION_CONTROL_DETAILS.tiff
782 KB
 040
 UG1.0
SITE UTILITY PLAN
040-UG1.0_SITE_UTILITY_PLAN.tiff
821 KB
 041
 UG1.1
SITE UTILITY PLAN
041-UG1.1_SITE_UTILITY_PLAN.tiff
701 KB
 042
 UG2.0
SITE UTIILITY DETAILS
042-UG2.0_SITE_UTIILITY_DETAILS.tiff
973 KB
 043
 B1.1B
BLAST LINING FLOOR PLAN
043-B1.1B_BLAST_LINING_FLOOR_PLAN.tiff
880 KB
 044
 B1.1D
DIESEL TANK PAD
044-B1.1D_DIESEL_TANK_PAD.tiff
530 KB
 045
 B1.1H
HAZMAT BUILDING
045-B1.1H_HAZMAT_BUILDING.tiff
696 KB
 046
 B1.1R
REPAIR SHOP FLOOR PLAN
046-B1.1R_REPAIR_SHOP_FLOOR_PLAN.tiff
715 KB
 047
 B1.2B
BLAST LINING MEZZANINE PLAN
047-B1.2B_BLAST_LINING_MEZZANINE_PLAN.tiff
896 KB
 048
 B1.2R
REPAIR SHOP ENLARGED PLANS
048-B1.2R_REPAIR_SHOP_ENLARGED_PLANS.tiff
701 KB
 049
 B1.3B
BLAST LINING ENLARGED PLANS
049-B1.3B_BLAST_LINING_ENLARGED_PLANS.tiff
719 KB
 050
 B1.4B
BLAST LINING ENLARGED PLANS
050-B1.4B_BLAST_LINING_ENLARGED_PLANS.tiff
654 KB
 051
 B1.5B
BLAST LINING ENLARGED PLAN
051-B1.5B_BLAST_LINING_ENLARGED_PLAN.tiff
601 KB
 052
 B1.6B
BLAST LINING ENLARGED PLAN
052-B1.6B_BLAST_LINING_ENLARGED_PLAN.tiff
669 KB
 053
 B1.7B
BLAST LINING ENLARGED PLAN
053-B1.7B_BLAST_LINING_ENLARGED_PLAN.tiff
601 KB
 054
 B2.1B
BLAST LINING SCHEDULES
054-B2.1B_BLAST_LINING_SCHEDULES.tiff
733 KB
 055
 B2.1R
REPAIR SHOP SCHEDULES
055-B2.1R_REPAIR_SHOP_SCHEDULES.tiff
712 KB
 056
 B3.1B
BLAST LINING CEILING PLAN
056-B3.1B_BLAST_LINING_CEILING_PLAN.tiff
631 KB
 057
 B3.1R
REPAIR SHOP ROOF PLAN
057-B3.1R_REPAIR_SHOP_ROOF_PLAN.tiff
864 KB
 058
 B3.2B
BLAST LINING ROOF PLAN
058-B3.2B_BLAST_LINING_ROOF_PLAN.tiff
599 KB
 059
 B3.2R
REPAIR SHOP CEILING PLAN
059-B3.2R_REPAIR_SHOP_CEILING_PLAN.tiff
569 KB
 060
 B4.1B
BLAST LINING ELEVATIONS
060-B4.1B_BLAST_LINING_ELEVATIONS.tiff
816 KB
 061
 B4.1R
REPAIR SHOP ELEVATIONS
061-B4.1R_REPAIR_SHOP_ELEVATIONS.tiff
689 KB
 062
 B4.2B
BLAST LINING ELEVATIONS
062-B4.2B_BLAST_LINING_ELEVATIONS.tiff
724 KB
 063
 B4.2R
REPAIR SHOP ELEVATIONS
063-B4.2R_REPAIR_SHOP_ELEVATIONS.tiff
688 KB
 064
 B5.1B
BLAST LINING CROSS SECTION
064-B5.1B_BLAST_LINING_CROSS_SECTION.tiff
651 KB
 065
 B5.1R
REPAIR SHOP SECTIONS
065-B5.1R_REPAIR_SHOP_SECTIONS.tiff
697 KB
 066
 B5.2B
BLAST LINING SECTIONS
066-B5.2B_BLAST_LINING_SECTIONS.tiff
780 KB
 067
 B6.1B
DETAILS
067-B6.1B_DETAILS.tiff
550 KB
 068
 S0.1B
FDN. GEN. NOTES & TYP. DETAILS
068-S0.1B_FDN._GEN._NOTES_&_TYP._DETAILS.tiff
817 KB
 069
 S0.1R
FDN GEN NOTES & TYP DETAILS
069-S0.1R_FDN_GEN_NOTES_&_TYP_DETAILS.tiff
749 KB
 070
 S1.1B
FOUNDATION PLAN
070-S1.1B_FOUNDATION_PLAN.tiff
1087 KB
 071
 S1.1R
FOUNDATION PLAN
071-S1.1R_FOUNDATION_PLAN.tiff
750 KB
 072
 S1.2B
ENLARGED FOUNDATION PLAN
072-S1.2B_ENLARGED_FOUNDATION_PLAN.tiff
761 KB
 073
 S1.3B
ENLARGED FOUNDATION PLAN
073-S1.3B_ENLARGED_FOUNDATION_PLAN.tiff
771 KB
 074
 S1.4B
ENLARGED FOUNDATION PLAN
074-S1.4B_ENLARGED_FOUNDATION_PLAN.tiff
792 KB
 075
 S2.1B
PLATFORM PLAN
075-S2.1B_PLATFORM_PLAN.tiff
744 KB
 076
 S2.2B
PLATFORM DETAILS
076-S2.2B_PLATFORM_DETAILS.tiff
653 KB
 077
 S3.1B
FOUNDATION DETAILS
077-S3.1B_FOUNDATION_DETAILS.tiff
757 KB
 078
 M0.1B
HVAC SCHEDULES AND NOTES
078-M0.1B_HVAC_SCHEDULES_AND_NOTES.tiff
416 KB
 079
 M0.2B
HVAC SCHEDULES
079-M0.2B_HVAC_SCHEDULES.tiff
324 KB
 080
 M0.3B
PIPING SCHEDULES AND NOTES
080-M0.3B_PIPING_SCHEDULES_AND_NOTES.tiff
310 KB
 081
 M0.4B
DETAILS
081-M0.4B_DETAILS.tiff
291 KB
 082
 M1.1B
HVAC PLAN
082-M1.1B_HVAC_PLAN.tiff
379 KB
 083
 M1.2B
ENLARGED HVAC PLANS
083-M1.2B_ENLARGED_HVAC_PLANS.tiff
332 KB
 084
 M1.3B
INTERIOR LINING
084-M1.3B_INTERIOR_LINING.tiff
378 KB
 085
 M1.4B
HOPPER LINING RM HVAC
085-M1.4B_HOPPER_LINING_RM_HVAC.tiff
380 KB
 086
 M1.5B
HVAC TIE IN PLAN
086-M1.5B_HVAC_TIE_IN_PLAN.tiff
372 KB
 087
 M2.1B
NATURAL GAS PLAN
087-M2.1B_NATURAL_GAS_PLAN.tiff
353 KB
 088
 M3.1B
COMPRESSED AIR PLAN
088-M3.1B_COMPRESSED_AIR_PLAN.tiff
397 KB
 089
 M3.2B
COMPRESSED AIR DETAILS
089-M3.2B_COMPRESSED_AIR_DETAILS.tiff
234 KB
 090
 P0.1B
PLUMBING SCHEDULES AND NOTES
090-P0.1B_PLUMBING_SCHEDULES_AND_NOTES.tiff
352 KB
 091
 P1.1B
DRAIN VENT PLAN
091-P1.1B_DRAIN_VENT_PLAN.tiff
419 KB
 093
 P1.2B
ENLARGED PLANS
093-P1.2B_ENLARGED_PLANS.tiff
332 KB
 093
 P2.1B
DOMESTIC WATER PLAN
093-P2.1B_DOMESTIC_WATER_PLAN.tiff
413 KB
 094
 P2.2B
ENLARGED PLANS
094-P2.2B_ENLARGED_PLANS.tiff
303 KB
 095
 E0.1
SITE PLAN ELECTRICAL
095-E0.1_SITE_PLAN_ELECTRICAL.tiff
672 KB
 096
 E1.1
OVERALL LIGHTING
096-E1.1_OVERALL_LIGHTING.tiff
628 KB
 097
 E1.2
NORTH FLOOR LIGHTING
097-E1.2_NORTH_FLOOR_LIGHTING.tiff
624 KB
 098
 E1.3
SOUTH FLOOR LIGHTING
098-E1.3_SOUTH_FLOOR_LIGHTING.tiff
638 KB
 099
 E1.4
OFFICE STORAGE LIGHTING
099-E1.4_OFFICE_STORAGE_LIGHTING.tiff
626 KB
 100
 E2.1
OVERALL POWER AND GROUNDING
100-E2.1_OVERALL_POWER_AND_GROUNDING.tiff
711 KB
 101
 E2.2
VENTILATION POWER
101-E2.2_VENTILATION_POWER.tiff
747 KB
 102
 E2.3
ENLARGED OFF STORAGE POWER
102-E2.3_ENLARGED_OFF_STORAGE_POWER.tiff
632 KB
 103
 E2.1
WEST ENLARGED POWER
103-E2.1_WEST_ENLARGED_POWER.tiff
639 KB
 104
 E2.5
EAST ENLARGED POWER
104-E2.5_EAST_ENLARGED_POWER.tiff
746 KB
 105
 E3.1
SCHEDULES
105-E3.1_SCHEDULES.tiff
651 KB
 106
 E3.2
SCHEDULES AND LEGEND
106-E3.2_SCHEDULES_AND_LEGEND.tiff
623 KB
 107
 E3.3
ELECTRICAL DETAILS
107-E3.3_ELECTRICAL_DETAILS.tiff
646 KB
 108
 E3.4
ELECTRICAL DETAILS
108-E3.4_ELECTRICAL_DETAILS.tiff
516 KB
 109
 E4.1
SINGLE LINE DIAGRAM
109-E4.1_SINGLE_LINE_DIAGRAM.tiff
573 KB
 110
 E4.2
PANEL SCHEDULES
110-E4.2_PANEL_SCHEDULES.tiff
633 KB
 111
 E4.3
PANEL SCHEDULES
111-E4.3_PANEL_SCHEDULES.tiff
598 KB
 112
 E4.4
PANEL SCHEDULES
112-E4.4_PANEL_SCHEDULES.tiff
616 KB
 113
 E4.5
PANEL SCHEDULES
113-E4.5_PANEL_SCHEDULES.tiff
587 KB
 114
 E4.6
PANEL SCHEDULES
114-E4.6_PANEL_SCHEDULES.tiff
597 KB
 115
 FP1.1B
FIRE SPRINKLER PLAN
115-FP1.1B_FIRE_SPRINKLER_PLAN.tiff
350 KB