Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
New Repair Shop and Blast/Paint Facility for American Industrial Transport
Forcum Lannom Contractors, LLC, on behalf of American Industrial Transport (AITX), is requesting proposals/bids to construct two (2) new buildings and the expansion of an existing rail storage yard at their facility in Brookhaven, MS. Both buildings will be pre-engineered metal structures with office/support areas. Work associated with the project consists of, but not limited to, the following: Demolition of an existing structure and miscellaneous site items , Earthwork/storm piping/erosion control/gravel base and paving/site utilities , Concrete foundations, slabs, pits, trenches, sidewalks, pads, paving , Masonry , Miscellaneous steel and work platforms , Carpentry and millwork/countertops , Insulation systems , Walk doors/overhead coiling doors/glass and glazing , Drywall and metal studs/acoustical ceilings/flooring/paint , Restroom specialties , Process related equipment: Blast and Paint Booths , Fall protection equipment , Pre-engineered metal building and erection , Bridge cranes/railcar transfer table , Fire protection , Plumbing , HVAC/Mechanical equipment , Electrical
Place Order
#
Sheet #
Sheet Name
Image Name (Click To View)
File Size
001
CV00
COVER SHEET
001-CV00_COVER_SHEET.tiff
523 KB
002
GC1.1B
GENERAL CODE INFORMATION
002-GC1.1B_GENERAL_CODE_INFORMATION.tiff
1066 KB
003
C1.1R
GENERAL CODE INFORMATION
003-C1.1R_GENERAL_CODE_INFORMATION.tiff
931 KB
004
GSL1.0
GENERAL SITE LOCATION PLAN
004-GSL1.0_GENERAL_SITE_LOCATION_PLAN.tiff
815 KB
005
C0.1
NOTES AND TYPICAL SITE DETAILS
005-C0.1_NOTES_AND_TYPICAL_SITE_DETAILS.tiff
874 KB
006
C0.2
TYPICAL SITE DETAILS
006-C0.2_TYPICAL_SITE_DETAILS.tiff
2174 KB
007
C1.0
OVERALL EXISTING CONDITIONS PLAN
007-C1.0_OVERALL_EXISTING_CONDITIONS_PLAN.tiff
651 KB
008
C1.1
PARTIAL EXISTING CONDITIONS PLAN
008-C1.1_PARTIAL_EXISTING_CONDITIONS_PLAN.tiff
637 KB
009
C1.2
OVERALL SITE DEMOLITON PLAN
009-C1.2_OVERALL_SITE_DEMOLITON_PLAN.tiff
640 KB
010
C1.3
SITE DEMOLITION PLAN EAST
010-C1.3_SITE_DEMOLITION_PLAN_EAST.tiff
636 KB
011
C1.4
SITE DEMOLITION PLAN WEST
011-C1.4_SITE_DEMOLITION_PLAN_WEST.tiff
646 KB
012
C2.0
OVERALL SITE LAYOUT PLAN
012-C2.0_OVERALL_SITE_LAYOUT_PLAN.tiff
753 KB
013
C2.1
PARTIAL SITE LAYOUT PLAN
013-C2.1_PARTIAL_SITE_LAYOUT_PLAN.tiff
826 KB
014
C2.2
PARTIAL SITE LAYOUT PLAN STORAGE RAIL EAST
014-C2.2_PARTIAL_SITE_LAYOUT_PLAN_STORAGE_RAIL_EAST.tiff
607 KB
015
C2.3
PARTIAL SITE LAYOUT PLAN WEST
015-C2.3_PARTIAL_SITE_LAYOUT_PLAN_WEST.tiff
641 KB
016
C3.0
OVERALL SITE GRADING PLAN
016-C3.0_OVERALL_SITE_GRADING_PLAN.tiff
879 KB
017
3.1
PARTIAL SITE GRADING PLAN
017-3.1_PARTIAL_SITE_GRADING_PLAN.tiff
957 KB
018
3.2
PARTIAL SITE GRADING PLAN STORAGE RAIL EAST
018-3.2_PARTIAL_SITE_GRADING_PLAN_STORAGE_RAIL_EAST.tiff
672 KB
019
C3.3
PARTIAL SITE GRADING PLAN WEST
019-C3.3_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
761 KB
020
C3.4
PARTIAL SITE GRADING PLAN WEST
020-C3.4_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
903 KB
021
C3.5
PARTIAL SITE GRADING PLAN WEST
021-C3.5_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
884 KB
022
C3.6
PARTIAL SITE GRADING PLAN WEST
022-C3.6_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
773 KB
023
C3.7
PARTIAL SITE GRADING PLAN WEST
023-C3.7_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
761 KB
024
C3.8
PARTIAL SITE GRADING PLAN WEST
024-C3.8_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
814 KB
025
C3.9
PARTIAL SITE GRADING PLAN WEST
025-C3.9_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
1078 KB
026
C3.10
PARTIAL SITE GRADING PLAN WEST
026-C3.10_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
985 KB
027
C3.11
PARTIAL SITE GRADING PLAN WEST
027-C3.11_PARTIAL_SITE_GRADING_PLAN_WEST.tiff
1121 KB
028
C4.0
PARTIAL STORM WATER DRAINAGE PLAN
028-C4.0_PARTIAL_STORM_WATER_DRAINAGE_PLAN.tiff
977 KB
029
C4.1
PARTIAL STORM WATER DRAINAGE PLAN
029-C4.1_PARTIAL_STORM_WATER_DRAINAGE_PLAN.tiff
640 KB
030
C4.2
DRAINAGE STRUCTURES AND PIPE INDEX
030-C4.2_DRAINAGE_STRUCTURES_AND_PIPE_INDEX.tiff
973 KB
031
C5.0
RAIL ALIGNMENT LAYOUT INDEX
031-C5.0_RAIL_ALIGNMENT_LAYOUT_INDEX.tiff
732 KB
032
C5.1
RAIL ALIGNMENT LAYOUT
032-C5.1_RAIL_ALIGNMENT_LAYOUT.tiff
751 KB
033
C5.2
RAIL ALIGNMENT LAYOUT
033-C5.2_RAIL_ALIGNMENT_LAYOUT.tiff
649 KB
034
C5.3
RAIL ALIGNMENT LAYOUT
034-C5.3_RAIL_ALIGNMENT_LAYOUT.tiff
783 KB
035
C5.4
RAIL ALIGNMENT LAYOUT
035-C5.4_RAIL_ALIGNMENT_LAYOUT.tiff
848 KB
036
C5.5
RAIL ALIGNMENT DETAILS
036-C5.5_RAIL_ALIGNMENT_DETAILS.tiff
958 KB
037
EC1.2
EROSION CONTROL PLAN
037-EC1.2_EROSION_CONTROL_PLAN.tiff
914 KB
038
EC1.1
EROSION CONTROL PLAN
038-EC1.1_EROSION_CONTROL_PLAN.tiff
922 KB
039
EC1.2
EROSION CONTROL DETAILS
039-EC1.2_EROSION_CONTROL_DETAILS.tiff
782 KB
040
UG1.0
SITE UTILITY PLAN
040-UG1.0_SITE_UTILITY_PLAN.tiff
821 KB
041
UG1.1
SITE UTILITY PLAN
041-UG1.1_SITE_UTILITY_PLAN.tiff
701 KB
042
UG2.0
SITE UTIILITY DETAILS
042-UG2.0_SITE_UTIILITY_DETAILS.tiff
973 KB
043
B1.1B
BLAST LINING FLOOR PLAN
043-B1.1B_BLAST_LINING_FLOOR_PLAN.tiff
880 KB
044
B1.1D
DIESEL TANK PAD
044-B1.1D_DIESEL_TANK_PAD.tiff
530 KB
045
B1.1H
HAZMAT BUILDING
045-B1.1H_HAZMAT_BUILDING.tiff
696 KB
046
B1.1R
REPAIR SHOP FLOOR PLAN
046-B1.1R_REPAIR_SHOP_FLOOR_PLAN.tiff
715 KB
047
B1.2B
BLAST LINING MEZZANINE PLAN
047-B1.2B_BLAST_LINING_MEZZANINE_PLAN.tiff
896 KB
048
B1.2R
REPAIR SHOP ENLARGED PLANS
048-B1.2R_REPAIR_SHOP_ENLARGED_PLANS.tiff
701 KB
049
B1.3B
BLAST LINING ENLARGED PLANS
049-B1.3B_BLAST_LINING_ENLARGED_PLANS.tiff
719 KB
050
B1.4B
BLAST LINING ENLARGED PLANS
050-B1.4B_BLAST_LINING_ENLARGED_PLANS.tiff
654 KB
051
B1.5B
BLAST LINING ENLARGED PLAN
051-B1.5B_BLAST_LINING_ENLARGED_PLAN.tiff
601 KB
052
B1.6B
BLAST LINING ENLARGED PLAN
052-B1.6B_BLAST_LINING_ENLARGED_PLAN.tiff
669 KB
053
B1.7B
BLAST LINING ENLARGED PLAN
053-B1.7B_BLAST_LINING_ENLARGED_PLAN.tiff
601 KB
054
B2.1B
BLAST LINING SCHEDULES
054-B2.1B_BLAST_LINING_SCHEDULES.tiff
733 KB
055
B2.1R
REPAIR SHOP SCHEDULES
055-B2.1R_REPAIR_SHOP_SCHEDULES.tiff
712 KB
056
B3.1B
BLAST LINING CEILING PLAN
056-B3.1B_BLAST_LINING_CEILING_PLAN.tiff
631 KB
057
B3.1R
REPAIR SHOP ROOF PLAN
057-B3.1R_REPAIR_SHOP_ROOF_PLAN.tiff
864 KB
058
B3.2B
BLAST LINING ROOF PLAN
058-B3.2B_BLAST_LINING_ROOF_PLAN.tiff
599 KB
059
B3.2R
REPAIR SHOP CEILING PLAN
059-B3.2R_REPAIR_SHOP_CEILING_PLAN.tiff
569 KB
060
B4.1B
BLAST LINING ELEVATIONS
060-B4.1B_BLAST_LINING_ELEVATIONS.tiff
816 KB
061
B4.1R
REPAIR SHOP ELEVATIONS
061-B4.1R_REPAIR_SHOP_ELEVATIONS.tiff
689 KB
062
B4.2B
BLAST LINING ELEVATIONS
062-B4.2B_BLAST_LINING_ELEVATIONS.tiff
724 KB
063
B4.2R
REPAIR SHOP ELEVATIONS
063-B4.2R_REPAIR_SHOP_ELEVATIONS.tiff
688 KB
064
B5.1B
BLAST LINING CROSS SECTION
064-B5.1B_BLAST_LINING_CROSS_SECTION.tiff
651 KB
065
B5.1R
REPAIR SHOP SECTIONS
065-B5.1R_REPAIR_SHOP_SECTIONS.tiff
697 KB
066
B5.2B
BLAST LINING SECTIONS
066-B5.2B_BLAST_LINING_SECTIONS.tiff
780 KB
067
B6.1B
DETAILS
067-B6.1B_DETAILS.tiff
550 KB
068
S0.1B
FDN. GEN. NOTES & TYP. DETAILS
068-S0.1B_FDN._GEN._NOTES_&_TYP._DETAILS.tiff
817 KB
069
S0.1R
FDN GEN NOTES & TYP DETAILS
069-S0.1R_FDN_GEN_NOTES_&_TYP_DETAILS.tiff
749 KB
070
S1.1B
FOUNDATION PLAN
070-S1.1B_FOUNDATION_PLAN.tiff
1087 KB
071
S1.1R
FOUNDATION PLAN
071-S1.1R_FOUNDATION_PLAN.tiff
750 KB
072
S1.2B
ENLARGED FOUNDATION PLAN
072-S1.2B_ENLARGED_FOUNDATION_PLAN.tiff
761 KB
073
S1.3B
ENLARGED FOUNDATION PLAN
073-S1.3B_ENLARGED_FOUNDATION_PLAN.tiff
771 KB
074
S1.4B
ENLARGED FOUNDATION PLAN
074-S1.4B_ENLARGED_FOUNDATION_PLAN.tiff
792 KB
075
S2.1B
PLATFORM PLAN
075-S2.1B_PLATFORM_PLAN.tiff
744 KB
076
S2.2B
PLATFORM DETAILS
076-S2.2B_PLATFORM_DETAILS.tiff
653 KB
077
S3.1B
FOUNDATION DETAILS
077-S3.1B_FOUNDATION_DETAILS.tiff
757 KB
078
M0.1B
HVAC SCHEDULES AND NOTES
078-M0.1B_HVAC_SCHEDULES_AND_NOTES.tiff
416 KB
079
M0.2B
HVAC SCHEDULES
079-M0.2B_HVAC_SCHEDULES.tiff
324 KB
080
M0.3B
PIPING SCHEDULES AND NOTES
080-M0.3B_PIPING_SCHEDULES_AND_NOTES.tiff
310 KB
081
M0.4B
DETAILS
081-M0.4B_DETAILS.tiff
291 KB
082
M1.1B
HVAC PLAN
082-M1.1B_HVAC_PLAN.tiff
379 KB
083
M1.2B
ENLARGED HVAC PLANS
083-M1.2B_ENLARGED_HVAC_PLANS.tiff
332 KB
084
M1.3B
INTERIOR LINING
084-M1.3B_INTERIOR_LINING.tiff
378 KB
085
M1.4B
HOPPER LINING RM HVAC
085-M1.4B_HOPPER_LINING_RM_HVAC.tiff
380 KB
086
M1.5B
HVAC TIE IN PLAN
086-M1.5B_HVAC_TIE_IN_PLAN.tiff
372 KB
087
M2.1B
NATURAL GAS PLAN
087-M2.1B_NATURAL_GAS_PLAN.tiff
353 KB
088
M3.1B
COMPRESSED AIR PLAN
088-M3.1B_COMPRESSED_AIR_PLAN.tiff
397 KB
089
M3.2B
COMPRESSED AIR DETAILS
089-M3.2B_COMPRESSED_AIR_DETAILS.tiff
234 KB
090
P0.1B
PLUMBING SCHEDULES AND NOTES
090-P0.1B_PLUMBING_SCHEDULES_AND_NOTES.tiff
352 KB
091
P1.1B
DRAIN VENT PLAN
091-P1.1B_DRAIN_VENT_PLAN.tiff
419 KB
093
P1.2B
ENLARGED PLANS
093-P1.2B_ENLARGED_PLANS.tiff
332 KB
093
P2.1B
DOMESTIC WATER PLAN
093-P2.1B_DOMESTIC_WATER_PLAN.tiff
413 KB
094
P2.2B
ENLARGED PLANS
094-P2.2B_ENLARGED_PLANS.tiff
303 KB
095
E0.1
SITE PLAN ELECTRICAL
095-E0.1_SITE_PLAN_ELECTRICAL.tiff
672 KB
096
E1.1
OVERALL LIGHTING
096-E1.1_OVERALL_LIGHTING.tiff
628 KB
097
E1.2
NORTH FLOOR LIGHTING
097-E1.2_NORTH_FLOOR_LIGHTING.tiff
624 KB
098
E1.3
SOUTH FLOOR LIGHTING
098-E1.3_SOUTH_FLOOR_LIGHTING.tiff
638 KB
099
E1.4
OFFICE STORAGE LIGHTING
099-E1.4_OFFICE_STORAGE_LIGHTING.tiff
626 KB
100
E2.1
OVERALL POWER AND GROUNDING
100-E2.1_OVERALL_POWER_AND_GROUNDING.tiff
711 KB
101
E2.2
VENTILATION POWER
101-E2.2_VENTILATION_POWER.tiff
747 KB
102
E2.3
ENLARGED OFF STORAGE POWER
102-E2.3_ENLARGED_OFF_STORAGE_POWER.tiff
632 KB
103
E2.1
WEST ENLARGED POWER
103-E2.1_WEST_ENLARGED_POWER.tiff
639 KB
104
E2.5
EAST ENLARGED POWER
104-E2.5_EAST_ENLARGED_POWER.tiff
746 KB
105
E3.1
SCHEDULES
105-E3.1_SCHEDULES.tiff
651 KB
106
E3.2
SCHEDULES AND LEGEND
106-E3.2_SCHEDULES_AND_LEGEND.tiff
623 KB
107
E3.3
ELECTRICAL DETAILS
107-E3.3_ELECTRICAL_DETAILS.tiff
646 KB
108
E3.4
ELECTRICAL DETAILS
108-E3.4_ELECTRICAL_DETAILS.tiff
516 KB
109
E4.1
SINGLE LINE DIAGRAM
109-E4.1_SINGLE_LINE_DIAGRAM.tiff
573 KB
110
E4.2
PANEL SCHEDULES
110-E4.2_PANEL_SCHEDULES.tiff
633 KB
111
E4.3
PANEL SCHEDULES
111-E4.3_PANEL_SCHEDULES.tiff
598 KB
112
E4.4
PANEL SCHEDULES
112-E4.4_PANEL_SCHEDULES.tiff
616 KB
113
E4.5
PANEL SCHEDULES
113-E4.5_PANEL_SCHEDULES.tiff
587 KB
114
E4.6
PANEL SCHEDULES
114-E4.6_PANEL_SCHEDULES.tiff
597 KB
115
FP1.1B
FIRE SPRINKLER PLAN
115-FP1.1B_FIRE_SPRINKLER_PLAN.tiff
350 KB