Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
Pearl High School Indoor Training Facility (WBA PROJ 5820)
New 1-story (approx. 12,000 sf) metal wall panel-clad locker room & training building. Also consists of a covered, open-air artificial turf practice field (approx. 56,000 sf). Structures consist of Pre-engineered Metal Building Framed System and slab-on-grade foundations. See drawings and specs for detailed information.
Place Order
Name
Spec Sheet(Click to View)
File Size / Approx. Download Time (56k Modem)
Description
DPR Viewable Specs
DPR_Viewable_Specs.pdf
3995 KB / 9m 17s