Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Dean Aircraft Services Hangar Additions & Alterations

The Project consists of adding the following types of spaces to the existing Dean Aircraft Service facility: new hangar, equipment storage, machine shop, parts storage, storage areas, business offices, conference room, and all support spaces. The project includes two elevators and two sets of egress stairs, and one access stair. The Work consists of a new 18,500 sf +/- Pre-Engineered Metal Building (PEMB) hangar, 6,700 sf +/- Pre-Engineered Metal Building (PEMB) with hangar shops, service, and support space on the ground floor and office space on the second floor. The exterior building envelope consists of metal wall panel. The roof is standing seam metal panel. Site work includes new parking and a concrete aircraft apron.
           Place Order 
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 T100
TITLE SHEET
001-T100_TITLE_SHEET.tiff
792 KB
 002
 AG100
GENERAL INFORMATION
002-AG100_GENERAL_INFORMATION.tiff
1003 KB
 003
 C101
GENERAL CIVIL NOTES
003-C101_GENERAL_CIVIL_NOTES.tiff
1087 KB
 004
 C102
EXISTING CONDITIONS
004-C102_EXISTING_CONDITIONS.tiff
959 KB
 005
 C103
SITE PLAN
005-C103_SITE_PLAN.tiff
856 KB
 006
 C104
GRADING AND DRAINAGE PLAN
006-C104_GRADING_AND_DRAINAGE_PLAN.tiff
912 KB
 007
 C105
UTILITY PLAN
007-C105_UTILITY_PLAN.tiff
951 KB
 008
 C106
JOINT LAYOUT PLAN
008-C106_JOINT_LAYOUT_PLAN.tiff
913 KB
 009
 C200
PAVEMENT DETAILS
009-C200_PAVEMENT_DETAILS.tiff
830 KB
 010
 C201
SITE DETAILS
010-C201_SITE_DETAILS.tiff
746 KB
 011
 C202
SITE DETAILS
011-C202_SITE_DETAILS.tiff
766 KB
 012
 C203
EROSION CONTROL DETAILS
012-C203_EROSION_CONTROL_DETAILS.tiff
785 KB
 013
 AD100
DEMOLITION PLAN
013-AD100_DEMOLITION_PLAN.tiff
728 KB
 014
 A100
OVERALL FLOOR PLAN AND ROOF PLAN
014-A100_OVERALL_FLOOR_PLAN_AND_ROOF_PLAN.tiff
961 KB
 015
 A110
BASE BID FLOOR PLAN
015-A110_BASE_BID_FLOOR_PLAN.tiff
825 KB
 016
 A111
BASE BID REFLECTED CEILING PLAN
016-A111_BASE_BID_REFLECTED_CEILING_PLAN.tiff
807 KB
 017
 A200
BASE BID ELEVATIONS
017-A200_BASE_BID_ELEVATIONS.tiff
1115 KB
 018
 A201
BASE BID ELEVATIONS
018-A201_BASE_BID_ELEVATIONS.tiff
1132 KB
 019
 A300
BASE BID SECTIONS
019-A300_BASE_BID_SECTIONS.tiff
1052 KB
 020
 A310
WALL SECTIONS
020-A310_WALL_SECTIONS.tiff
890 KB
 021
 A311
WALL SECTIONS
021-A311_WALL_SECTIONS.tiff
912 KB
 022
 A312
HANGAR DOOR DETAILS
022-A312_HANGAR_DOOR_DETAILS.tiff
855 KB
 023
 A400
DOOR SCHEDULE
023-A400_DOOR_SCHEDULE.tiff
883 KB
 024
 A401
PARTITION TYPES
024-A401_PARTITION_TYPES.tiff
932 KB
 025
 A402
ROOF ACCESS LADDER
025-A402_ROOF_ACCESS_LADDER.tiff
856 KB
 026
 A500
ALTERNATE 1 FLOOR PLANS
026-A500_ALTERNATE_1_FLOOR_PLANS.tiff
839 KB
 027
 A501
ALTERNATE 1 REFLECTED CEILING PLANS
027-A501_ALTERNATE_1_REFLECTED_CEILING_PLANS.tiff
862 KB
 028
 A502
ALTERNATE 1 SECTIONS
028-A502_ALTERNATE_1_SECTIONS.tiff
948 KB
 029
 A503
ALTERNATE 1 ELEVATOR SHAFTS
029-A503_ALTERNATE_1_ELEVATOR_SHAFTS.tiff
1005 KB
 030
 A504
ALTERNATE 1 STAIRS
030-A504_ALTERNATE_1_STAIRS.tiff
812 KB
 031
 A505
ALTERNATE 1 STAIR DETAILS DOOR & FINISH SCHEDULES
031-A505_ALTERNATE_1_STAIR_DETAILS_DOOR_&_FINISH_SCHEDULES.tiff
759 KB
 032
 A600
ALTERNATE 2 FLOOR PLANS
032-A600_ALTERNATE_2_FLOOR_PLANS.tiff
897 KB
 033
 A601
ALTERNATE 2 REFLECTED CEILING PLANS
033-A601_ALTERNATE_2_REFLECTED_CEILING_PLANS.tiff
925 KB
 034
 A602
ALTERNATE 2 DOOR & WINDOW SCHEDULE RESTROOMS & MILLWORK
034-A602_ALTERNATE_2_DOOR_&_WINDOW_SCHEDULE_RESTROOMS_&_MILLWORK.tiff
909 KB
 035
 A700
ALTERNATE 3 FLOOR PLANS & RCPS
035-A700_ALTERNATE_3_FLOOR_PLANS_&_RCPS.tiff
1013 KB
 036
 A701
ALTERNATE 3 EAST ENTRY DETAILS
036-A701_ALTERNATE_3_EAST_ENTRY_DETAILS.tiff
900 KB
 037
 A702
ALTERNATE 3 WEST ENTRY DETAILS
037-A702_ALTERNATE_3_WEST_ENTRY_DETAILS.tiff
868 KB
 038
 A703
ALTERNATE 3 DOOR FINISH & WINDOW SCHEDULE
038-A703_ALTERNATE_3_DOOR_FINISH_&_WINDOW_SCHEDULE.tiff
871 KB
 039
 A800
ALTERNATE 4 FLOOR PLAN RCP & RESTROOMS
039-A800_ALTERNATE_4_FLOOR_PLAN_RCP_&_RESTROOMS.tiff
1063 KB
 040
 A801
ALTERNATE 4 ELEVATIONS
040-A801_ALTERNATE_4_ELEVATIONS.tiff
986 KB
 041
 A802
ALTERNATE 4 DOOR FINISH & WINDOW SCHEDULES
041-A802_ALTERNATE_4_DOOR_FINISH_&_WINDOW_SCHEDULES.tiff
875 KB
 042
 S100
STRUCTURAL GENERAL NOTES A
042-S100_STRUCTURAL_GENERAL_NOTES_A.tiff
1073 KB
 043
 S101
STRUCTURAL GENERAL NOTES B
043-S101_STRUCTURAL_GENERAL_NOTES_B.tiff
867 KB
 044
 S102
SCHEDULE OF SPECIAL INSPECTIONS
044-S102_SCHEDULE_OF_SPECIAL_INSPECTIONS.tiff
1025 KB
 045
 S103
BASE BID FOUNDATION FRAMING PLAN
045-S103_BASE_BID_FOUNDATION_FRAMING_PLAN.tiff
856 KB
 046
 S104
BASE BID ROOF FRAMING PLAN
046-S104_BASE_BID_ROOF_FRAMING_PLAN.tiff
837 KB
 047
 S105
ALTERNATE 1 FOUNDATION FRAMING PLAN
047-S105_ALTERNATE_1_FOUNDATION_FRAMING_PLAN.tiff
866 KB
 048
 S106
ALTERNATE 1 MEZZANINE FRAMING PLAN
048-S106_ALTERNATE_1_MEZZANINE_FRAMING_PLAN.tiff
802 KB
 049
 S107
ALTERNATE 1 ROOF FRAMING PLAN
049-S107_ALTERNATE_1_ROOF_FRAMING_PLAN.tiff
829 KB
 050
 S108
CMU DETAILS
050-S108_CMU_DETAILS.tiff
937 KB
 051
 S201
FOUNDATION DETAILS
051-S201_FOUNDATION_DETAILS.tiff
989 KB
 052
 S202
FOUNDATION DETAILS
052-S202_FOUNDATION_DETAILS.tiff
851 KB
 053
 S301
STEEL DETAILS
053-S301_STEEL_DETAILS.tiff
775 KB
 054
 S401
COLUMN SCHEDULE & DETAILS
054-S401_COLUMN_SCHEDULE_&_DETAILS.tiff
865 KB
 055
 S402
COLUMN DETAILS
055-S402_COLUMN_DETAILS.tiff
856 KB
 056
 S403
COLUMN DETAILS
056-S403_COLUMN_DETAILS.tiff
765 KB
 057
 S404
COLUMN DETAILS
057-S404_COLUMN_DETAILS.tiff
783 KB
 058
 S405
COLUMN DETAILS
058-S405_COLUMN_DETAILS.tiff
774 KB
 059
 S406
COLUMN DETAILS
059-S406_COLUMN_DETAILS.tiff
693 KB
 060
 P100
PLUMBING LEGEND ABBREVIATIONS AND NOTES
060-P100_PLUMBING_LEGEND_ABBREVIATIONS_AND_NOTES.tiff
847 KB
 061
 P101
BASE BID FIRST FLOOR PLUMBINB SANITARY
061-P101_BASE_BID_FIRST_FLOOR_PLUMBINB_SANITARY.tiff
703 KB
 062
 P102
BASE BID FIRST FLOOR PLUMBING SUPPLY
062-P102_BASE_BID_FIRST_FLOOR_PLUMBING_SUPPLY.tiff
692 KB
 063
 P103
BASE BID UPPER HANGAR PLUMBING SUPPLY
063-P103_BASE_BID_UPPER_HANGAR_PLUMBING_SUPPLY.tiff
682 KB
 064
 P104
ALTERNATE 1 FIRST FLOOR PLUMBING SANITARY
064-P104_ALTERNATE_1_FIRST_FLOOR_PLUMBING_SANITARY.tiff
714 KB
 065
 P105
ALTERNATE 1 SECOND FLOOR PLUMBING SANITARY
065-P105_ALTERNATE_1_SECOND_FLOOR_PLUMBING_SANITARY.tiff
667 KB
 066
 P106
ALTERNATE 2 3 FIRST FLOOR PLUMBING SANITARY
066-P106_ALTERNATE_2_3_FIRST_FLOOR_PLUMBING_SANITARY.tiff
743 KB
 067
 P107
ALTERNATE 2 3 FIRST FLOOR PLUMBING SUPPLY
067-P107_ALTERNATE_2_3_FIRST_FLOOR_PLUMBING_SUPPLY.tiff
739 KB
 068
 P108
ALTERNATE 4 SECOND FLOOR PLUMBING SUPPLY
068-P108_ALTERNATE_4_SECOND_FLOOR_PLUMBING_SUPPLY.tiff
731 KB
 069
 P109
ALTERNATE 4 SECOND FLOOR PLUMBING SUPPLY
069-P109_ALTERNATE_4_SECOND_FLOOR_PLUMBING_SUPPLY.tiff
735 KB
 070
 P301
PLUMBING DETAILS
070-P301_PLUMBING_DETAILS.tiff
916 KB
 071
 P302
PLUMBING RISERS
071-P302_PLUMBING_RISERS.tiff
672 KB
 072
 P401
PLUMBING SCHEDULES
072-P401_PLUMBING_SCHEDULES.tiff
845 KB
 073
 FP101
BASE BID FIRST FLOOR FIRE PROTECTION
073-FP101_BASE_BID_FIRST_FLOOR_FIRE_PROTECTION.tiff
759 KB
 074
 FP102
BASE BID EXISTING FIRST FLOOR FIRE PROTECTION
074-FP102_BASE_BID_EXISTING_FIRST_FLOOR_FIRE_PROTECTION.tiff
741 KB
 075
 FP103
ALTERNATE1-4 FIRST & SECOND FLOOR FIRE PROTECTION
075-FP103_ALTERNATE1-4_FIRST_&_SECOND_FLOOR_FIRE_PROTECTION.tiff
789 KB
 076
 FP301
FIRE PROTECTION DETAILS & SCHEDULES
076-FP301_FIRE_PROTECTION_DETAILS_&_SCHEDULES.tiff
739 KB
 077
 M001
HVAC LEGENDS ABBREVIATIONS & NOTES
077-M001_HVAC_LEGENDS_ABBREVIATIONS_&_NOTES.tiff
927 KB
 078
 M101
FIRST FLOOR HVAC PLAN BASE BID & ALTERNATE 1
078-M101_FIRST_FLOOR_HVAC_PLAN_BASE_BID_&_ALTERNATE_1.tiff
730 KB
 079
 M102
FIRST FLOOR HVAC PLAN ALTERNATE 2
079-M102_FIRST_FLOOR_HVAC_PLAN_ALTERNATE_2.tiff
782 KB
 080
 M103
FIRST FLOOR HVAC PLAN ALTERNATE 3 & 4
080-M103_FIRST_FLOOR_HVAC_PLAN_ALTERNATE_3_&_4.tiff
818 KB
 081
 M104
SECOND FLOOR HVAC PLAN ALTERNATE 1 2 & 3
081-M104_SECOND_FLOOR_HVAC_PLAN_ALTERNATE_1_2_&_3.tiff
684 KB
 082
 M105
SECOND FLOOR HVAC PLAN ALTERNATE 4
082-M105_SECOND_FLOOR_HVAC_PLAN_ALTERNATE_4.tiff
770 KB
 083
 M106
SECOND FLOOR HVAC T-STAT PLAN ALTERNATE 4
083-M106_SECOND_FLOOR_HVAC_T-STAT_PLAN_ALTERNATE_4.tiff
774 KB
 084
 M501
HVAC DETAILS
084-M501_HVAC_DETAILS.tiff
901 KB
 085
 M502
HVAC DETAILS
085-M502_HVAC_DETAILS.tiff
654 KB
 086
 M601
HVAC SCHEDULES
086-M601_HVAC_SCHEDULES.tiff
972 KB
 087
 M602
HVAC SCHEDULES
087-M602_HVAC_SCHEDULES.tiff
755 KB
 088
 E000
ELECTRICAL LEGEND
088-E000_ELECTRICAL_LEGEND.tiff
997 KB
 089
 E001
ELECTRICAL DETAILS
089-E001_ELECTRICAL_DETAILS.tiff
924 KB
 090
 E002
ELECTRICAL RENOVATION SITE PLAN
090-E002_ELECTRICAL_RENOVATION_SITE_PLAN.tiff
726 KB
 091
 E003
PUMP HOUSE ELECTRICAL PLAN & DETAILS
091-E003_PUMP_HOUSE_ELECTRICAL_PLAN_&_DETAILS.tiff
754 KB
 092
 E004
LIGHTNING PROTECTION
092-E004_LIGHTNING_PROTECTION.tiff
928 KB
 093
 E005
TELEPHONE RISER DIAGRAM
093-E005_TELEPHONE_RISER_DIAGRAM.tiff
716 KB
 094
 E006
TELEPHONE RISER DIAGRAM
094-E006_TELEPHONE_RISER_DIAGRAM.tiff
951 KB
 095
 E100
LIGHTING PLAN HANGAR SHOP BASE BID
095-E100_LIGHTING_PLAN_HANGAR_SHOP_BASE_BID.tiff
804 KB
 096
 E101
LIGHTING PLAN LEVEL 01 ALTERNATE 1
096-E101_LIGHTING_PLAN_LEVEL_01_ALTERNATE_1.tiff
970 KB
 097
 E102
LIGHTING PLAN MEZZANINE ALTERNATE 1 2 3 & 4
097-E102_LIGHTING_PLAN_MEZZANINE_ALTERNATE_1_2_3_&_4.tiff
951 KB
 098
 E200
POWER PLAN HANGAR SHOP BASE BID
098-E200_POWER_PLAN_HANGAR_SHOP_BASE_BID.tiff
774 KB
 099
 E201
POWER PLAN HANGAR SHOP ALTERNATE 1
099-E201_POWER_PLAN_HANGAR_SHOP_ALTERNATE_1.tiff
909 KB
 100
 E202
POWER PLAN MEZZANINE ALTERNATE 1 2 3 & 4
100-E202_POWER_PLAN_MEZZANINE_ALTERNATE_1_2_3_&_4.tiff
892 KB
 101
 E300
AUXILIARY PLAN HANGAR SHOP BASE BID
101-E300_AUXILIARY_PLAN_HANGAR_SHOP_BASE_BID.tiff
742 KB
 102
 E301
AUXILIARY PLAN HANGAR SHOP ALTERNATE 2
102-E301_AUXILIARY_PLAN_HANGAR_SHOP_ALTERNATE_2.tiff
801 KB
 103
 E302
AUXILIARY PLAN MEZZANINE ALTERNATE 1 2 3 & 4
103-E302_AUXILIARY_PLAN_MEZZANINE_ALTERNATE_1_2_3_&_4.tiff
860 KB
 104
 E303
ELEVATOR EQUIPMENT
104-E303_ELEVATOR_EQUIPMENT.tiff
826 KB
 105
 E400
MECHANICAL PLAN HANGAR SHOP BASE BID
105-E400_MECHANICAL_PLAN_HANGAR_SHOP_BASE_BID.tiff
744 KB
 106
 E401
MECHANICAL PLAN HANGAR SHOP ALTERNATE 1
106-E401_MECHANICAL_PLAN_HANGAR_SHOP_ALTERNATE_1.tiff
956 KB
 107
 ED100
POWER PLAN HANGAR SHOP BASE BID
107-ED100_POWER_PLAN_HANGAR_SHOP_BASE_BID.tiff
749 KB