Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
Dean Aircraft Services Hangar Additions & Alterations
The Project consists of adding the following types of spaces to the existing Dean Aircraft Service facility: new hangar, equipment storage, machine shop, parts storage, storage areas, business offices, conference room, and all support spaces. The project includes two elevators and two sets of egress stairs, and one access stair. The Work consists of a new 18,500 sf +/- Pre-Engineered Metal Building (PEMB) hangar, 6,700 sf +/- Pre-Engineered Metal Building (PEMB) with hangar shops, service, and support space on the ground floor and office space on the second floor. The exterior building envelope consists of metal wall panel. The roof is standing seam metal panel. Site work includes new parking and a concrete aircraft apron.
Place Order
#
Sheet #
Sheet Name
Image Name (Click To View)
File Size
001
T100
TITLE SHEET
001-T100_TITLE_SHEET.tiff
792 KB
002
AG100
GENERAL INFORMATION
002-AG100_GENERAL_INFORMATION.tiff
1003 KB
003
C101
GENERAL CIVIL NOTES
003-C101_GENERAL_CIVIL_NOTES.tiff
1087 KB
004
C102
EXISTING CONDITIONS
004-C102_EXISTING_CONDITIONS.tiff
959 KB
005
C103
SITE PLAN
005-C103_SITE_PLAN.tiff
856 KB
006
C104
GRADING AND DRAINAGE PLAN
006-C104_GRADING_AND_DRAINAGE_PLAN.tiff
912 KB
007
C105
UTILITY PLAN
007-C105_UTILITY_PLAN.tiff
951 KB
008
C106
JOINT LAYOUT PLAN
008-C106_JOINT_LAYOUT_PLAN.tiff
913 KB
009
C200
PAVEMENT DETAILS
009-C200_PAVEMENT_DETAILS.tiff
830 KB
010
C201
SITE DETAILS
010-C201_SITE_DETAILS.tiff
746 KB
011
C202
SITE DETAILS
011-C202_SITE_DETAILS.tiff
766 KB
012
C203
EROSION CONTROL DETAILS
012-C203_EROSION_CONTROL_DETAILS.tiff
785 KB
013
AD100
DEMOLITION PLAN
013-AD100_DEMOLITION_PLAN.tiff
728 KB
014
A100
OVERALL FLOOR PLAN AND ROOF PLAN
014-A100_OVERALL_FLOOR_PLAN_AND_ROOF_PLAN.tiff
961 KB
015
A110
BASE BID FLOOR PLAN
015-A110_BASE_BID_FLOOR_PLAN.tiff
825 KB
016
A111
BASE BID REFLECTED CEILING PLAN
016-A111_BASE_BID_REFLECTED_CEILING_PLAN.tiff
807 KB
017
A200
BASE BID ELEVATIONS
017-A200_BASE_BID_ELEVATIONS.tiff
1115 KB
018
A201
BASE BID ELEVATIONS
018-A201_BASE_BID_ELEVATIONS.tiff
1132 KB
019
A300
BASE BID SECTIONS
019-A300_BASE_BID_SECTIONS.tiff
1052 KB
020
A310
WALL SECTIONS
020-A310_WALL_SECTIONS.tiff
890 KB
021
A311
WALL SECTIONS
021-A311_WALL_SECTIONS.tiff
912 KB
022
A312
HANGAR DOOR DETAILS
022-A312_HANGAR_DOOR_DETAILS.tiff
855 KB
023
A400
DOOR SCHEDULE
023-A400_DOOR_SCHEDULE.tiff
883 KB
024
A401
PARTITION TYPES
024-A401_PARTITION_TYPES.tiff
932 KB
025
A402
ROOF ACCESS LADDER
025-A402_ROOF_ACCESS_LADDER.tiff
856 KB
026
A500
ALTERNATE 1 FLOOR PLANS
026-A500_ALTERNATE_1_FLOOR_PLANS.tiff
839 KB
027
A501
ALTERNATE 1 REFLECTED CEILING PLANS
027-A501_ALTERNATE_1_REFLECTED_CEILING_PLANS.tiff
862 KB
028
A502
ALTERNATE 1 SECTIONS
028-A502_ALTERNATE_1_SECTIONS.tiff
948 KB
029
A503
ALTERNATE 1 ELEVATOR SHAFTS
029-A503_ALTERNATE_1_ELEVATOR_SHAFTS.tiff
1005 KB
030
A504
ALTERNATE 1 STAIRS
030-A504_ALTERNATE_1_STAIRS.tiff
812 KB
031
A505
ALTERNATE 1 STAIR DETAILS DOOR & FINISH SCHEDULES
031-A505_ALTERNATE_1_STAIR_DETAILS_DOOR_&_FINISH_SCHEDULES.tiff
759 KB
032
A600
ALTERNATE 2 FLOOR PLANS
032-A600_ALTERNATE_2_FLOOR_PLANS.tiff
897 KB
033
A601
ALTERNATE 2 REFLECTED CEILING PLANS
033-A601_ALTERNATE_2_REFLECTED_CEILING_PLANS.tiff
925 KB
034
A602
ALTERNATE 2 DOOR & WINDOW SCHEDULE RESTROOMS & MILLWORK
034-A602_ALTERNATE_2_DOOR_&_WINDOW_SCHEDULE_RESTROOMS_&_MILLWORK.tiff
909 KB
035
A700
ALTERNATE 3 FLOOR PLANS & RCPS
035-A700_ALTERNATE_3_FLOOR_PLANS_&_RCPS.tiff
1013 KB
036
A701
ALTERNATE 3 EAST ENTRY DETAILS
036-A701_ALTERNATE_3_EAST_ENTRY_DETAILS.tiff
900 KB
037
A702
ALTERNATE 3 WEST ENTRY DETAILS
037-A702_ALTERNATE_3_WEST_ENTRY_DETAILS.tiff
868 KB
038
A703
ALTERNATE 3 DOOR FINISH & WINDOW SCHEDULE
038-A703_ALTERNATE_3_DOOR_FINISH_&_WINDOW_SCHEDULE.tiff
871 KB
039
A800
ALTERNATE 4 FLOOR PLAN RCP & RESTROOMS
039-A800_ALTERNATE_4_FLOOR_PLAN_RCP_&_RESTROOMS.tiff
1063 KB
040
A801
ALTERNATE 4 ELEVATIONS
040-A801_ALTERNATE_4_ELEVATIONS.tiff
986 KB
041
A802
ALTERNATE 4 DOOR FINISH & WINDOW SCHEDULES
041-A802_ALTERNATE_4_DOOR_FINISH_&_WINDOW_SCHEDULES.tiff
875 KB
042
S100
STRUCTURAL GENERAL NOTES A
042-S100_STRUCTURAL_GENERAL_NOTES_A.tiff
1073 KB
043
S101
STRUCTURAL GENERAL NOTES B
043-S101_STRUCTURAL_GENERAL_NOTES_B.tiff
867 KB
044
S102
SCHEDULE OF SPECIAL INSPECTIONS
044-S102_SCHEDULE_OF_SPECIAL_INSPECTIONS.tiff
1025 KB
045
S103
BASE BID FOUNDATION FRAMING PLAN
045-S103_BASE_BID_FOUNDATION_FRAMING_PLAN.tiff
856 KB
046
S104
BASE BID ROOF FRAMING PLAN
046-S104_BASE_BID_ROOF_FRAMING_PLAN.tiff
837 KB
047
S105
ALTERNATE 1 FOUNDATION FRAMING PLAN
047-S105_ALTERNATE_1_FOUNDATION_FRAMING_PLAN.tiff
866 KB
048
S106
ALTERNATE 1 MEZZANINE FRAMING PLAN
048-S106_ALTERNATE_1_MEZZANINE_FRAMING_PLAN.tiff
802 KB
049
S107
ALTERNATE 1 ROOF FRAMING PLAN
049-S107_ALTERNATE_1_ROOF_FRAMING_PLAN.tiff
829 KB
050
S108
CMU DETAILS
050-S108_CMU_DETAILS.tiff
937 KB
051
S201
FOUNDATION DETAILS
051-S201_FOUNDATION_DETAILS.tiff
989 KB
052
S202
FOUNDATION DETAILS
052-S202_FOUNDATION_DETAILS.tiff
851 KB
053
S301
STEEL DETAILS
053-S301_STEEL_DETAILS.tiff
775 KB
054
S401
COLUMN SCHEDULE & DETAILS
054-S401_COLUMN_SCHEDULE_&_DETAILS.tiff
865 KB
055
S402
COLUMN DETAILS
055-S402_COLUMN_DETAILS.tiff
856 KB
056
S403
COLUMN DETAILS
056-S403_COLUMN_DETAILS.tiff
765 KB
057
S404
COLUMN DETAILS
057-S404_COLUMN_DETAILS.tiff
783 KB
058
S405
COLUMN DETAILS
058-S405_COLUMN_DETAILS.tiff
774 KB
059
S406
COLUMN DETAILS
059-S406_COLUMN_DETAILS.tiff
693 KB
060
P100
PLUMBING LEGEND ABBREVIATIONS AND NOTES
060-P100_PLUMBING_LEGEND_ABBREVIATIONS_AND_NOTES.tiff
847 KB
061
P101
BASE BID FIRST FLOOR PLUMBINB SANITARY
061-P101_BASE_BID_FIRST_FLOOR_PLUMBINB_SANITARY.tiff
703 KB
062
P102
BASE BID FIRST FLOOR PLUMBING SUPPLY
062-P102_BASE_BID_FIRST_FLOOR_PLUMBING_SUPPLY.tiff
692 KB
063
P103
BASE BID UPPER HANGAR PLUMBING SUPPLY
063-P103_BASE_BID_UPPER_HANGAR_PLUMBING_SUPPLY.tiff
682 KB
064
P104
ALTERNATE 1 FIRST FLOOR PLUMBING SANITARY
064-P104_ALTERNATE_1_FIRST_FLOOR_PLUMBING_SANITARY.tiff
714 KB
065
P105
ALTERNATE 1 SECOND FLOOR PLUMBING SANITARY
065-P105_ALTERNATE_1_SECOND_FLOOR_PLUMBING_SANITARY.tiff
667 KB
066
P106
ALTERNATE 2 3 FIRST FLOOR PLUMBING SANITARY
066-P106_ALTERNATE_2_3_FIRST_FLOOR_PLUMBING_SANITARY.tiff
743 KB
067
P107
ALTERNATE 2 3 FIRST FLOOR PLUMBING SUPPLY
067-P107_ALTERNATE_2_3_FIRST_FLOOR_PLUMBING_SUPPLY.tiff
739 KB
068
P108
ALTERNATE 4 SECOND FLOOR PLUMBING SUPPLY
068-P108_ALTERNATE_4_SECOND_FLOOR_PLUMBING_SUPPLY.tiff
731 KB
069
P109
ALTERNATE 4 SECOND FLOOR PLUMBING SUPPLY
069-P109_ALTERNATE_4_SECOND_FLOOR_PLUMBING_SUPPLY.tiff
735 KB
070
P301
PLUMBING DETAILS
070-P301_PLUMBING_DETAILS.tiff
916 KB
071
P302
PLUMBING RISERS
071-P302_PLUMBING_RISERS.tiff
672 KB
072
P401
PLUMBING SCHEDULES
072-P401_PLUMBING_SCHEDULES.tiff
845 KB
073
FP101
BASE BID FIRST FLOOR FIRE PROTECTION
073-FP101_BASE_BID_FIRST_FLOOR_FIRE_PROTECTION.tiff
759 KB
074
FP102
BASE BID EXISTING FIRST FLOOR FIRE PROTECTION
074-FP102_BASE_BID_EXISTING_FIRST_FLOOR_FIRE_PROTECTION.tiff
741 KB
075
FP103
ALTERNATE1-4 FIRST & SECOND FLOOR FIRE PROTECTION
075-FP103_ALTERNATE1-4_FIRST_&_SECOND_FLOOR_FIRE_PROTECTION.tiff
789 KB
076
FP301
FIRE PROTECTION DETAILS & SCHEDULES
076-FP301_FIRE_PROTECTION_DETAILS_&_SCHEDULES.tiff
739 KB
077
M001
HVAC LEGENDS ABBREVIATIONS & NOTES
077-M001_HVAC_LEGENDS_ABBREVIATIONS_&_NOTES.tiff
927 KB
078
M101
FIRST FLOOR HVAC PLAN BASE BID & ALTERNATE 1
078-M101_FIRST_FLOOR_HVAC_PLAN_BASE_BID_&_ALTERNATE_1.tiff
730 KB
079
M102
FIRST FLOOR HVAC PLAN ALTERNATE 2
079-M102_FIRST_FLOOR_HVAC_PLAN_ALTERNATE_2.tiff
782 KB
080
M103
FIRST FLOOR HVAC PLAN ALTERNATE 3 & 4
080-M103_FIRST_FLOOR_HVAC_PLAN_ALTERNATE_3_&_4.tiff
818 KB
081
M104
SECOND FLOOR HVAC PLAN ALTERNATE 1 2 & 3
081-M104_SECOND_FLOOR_HVAC_PLAN_ALTERNATE_1_2_&_3.tiff
684 KB
082
M105
SECOND FLOOR HVAC PLAN ALTERNATE 4
082-M105_SECOND_FLOOR_HVAC_PLAN_ALTERNATE_4.tiff
770 KB
083
M106
SECOND FLOOR HVAC T-STAT PLAN ALTERNATE 4
083-M106_SECOND_FLOOR_HVAC_T-STAT_PLAN_ALTERNATE_4.tiff
774 KB
084
M501
HVAC DETAILS
084-M501_HVAC_DETAILS.tiff
901 KB
085
M502
HVAC DETAILS
085-M502_HVAC_DETAILS.tiff
654 KB
086
M601
HVAC SCHEDULES
086-M601_HVAC_SCHEDULES.tiff
972 KB
087
M602
HVAC SCHEDULES
087-M602_HVAC_SCHEDULES.tiff
755 KB
088
E000
ELECTRICAL LEGEND
088-E000_ELECTRICAL_LEGEND.tiff
997 KB
089
E001
ELECTRICAL DETAILS
089-E001_ELECTRICAL_DETAILS.tiff
924 KB
090
E002
ELECTRICAL RENOVATION SITE PLAN
090-E002_ELECTRICAL_RENOVATION_SITE_PLAN.tiff
726 KB
091
E003
PUMP HOUSE ELECTRICAL PLAN & DETAILS
091-E003_PUMP_HOUSE_ELECTRICAL_PLAN_&_DETAILS.tiff
754 KB
092
E004
LIGHTNING PROTECTION
092-E004_LIGHTNING_PROTECTION.tiff
928 KB
093
E005
TELEPHONE RISER DIAGRAM
093-E005_TELEPHONE_RISER_DIAGRAM.tiff
716 KB
094
E006
TELEPHONE RISER DIAGRAM
094-E006_TELEPHONE_RISER_DIAGRAM.tiff
951 KB
095
E100
LIGHTING PLAN HANGAR SHOP BASE BID
095-E100_LIGHTING_PLAN_HANGAR_SHOP_BASE_BID.tiff
804 KB
096
E101
LIGHTING PLAN LEVEL 01 ALTERNATE 1
096-E101_LIGHTING_PLAN_LEVEL_01_ALTERNATE_1.tiff
970 KB
097
E102
LIGHTING PLAN MEZZANINE ALTERNATE 1 2 3 & 4
097-E102_LIGHTING_PLAN_MEZZANINE_ALTERNATE_1_2_3_&_4.tiff
951 KB
098
E200
POWER PLAN HANGAR SHOP BASE BID
098-E200_POWER_PLAN_HANGAR_SHOP_BASE_BID.tiff
774 KB
099
E201
POWER PLAN HANGAR SHOP ALTERNATE 1
099-E201_POWER_PLAN_HANGAR_SHOP_ALTERNATE_1.tiff
909 KB
100
E202
POWER PLAN MEZZANINE ALTERNATE 1 2 3 & 4
100-E202_POWER_PLAN_MEZZANINE_ALTERNATE_1_2_3_&_4.tiff
892 KB
101
E300
AUXILIARY PLAN HANGAR SHOP BASE BID
101-E300_AUXILIARY_PLAN_HANGAR_SHOP_BASE_BID.tiff
742 KB
102
E301
AUXILIARY PLAN HANGAR SHOP ALTERNATE 2
102-E301_AUXILIARY_PLAN_HANGAR_SHOP_ALTERNATE_2.tiff
801 KB
103
E302
AUXILIARY PLAN MEZZANINE ALTERNATE 1 2 3 & 4
103-E302_AUXILIARY_PLAN_MEZZANINE_ALTERNATE_1_2_3_&_4.tiff
860 KB
104
E303
ELEVATOR EQUIPMENT
104-E303_ELEVATOR_EQUIPMENT.tiff
826 KB
105
E400
MECHANICAL PLAN HANGAR SHOP BASE BID
105-E400_MECHANICAL_PLAN_HANGAR_SHOP_BASE_BID.tiff
744 KB
106
E401
MECHANICAL PLAN HANGAR SHOP ALTERNATE 1
106-E401_MECHANICAL_PLAN_HANGAR_SHOP_ALTERNATE_1.tiff
956 KB
107
ED100
POWER PLAN HANGAR SHOP BASE BID
107-ED100_POWER_PLAN_HANGAR_SHOP_BASE_BID.tiff
749 KB