Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
UMMC Fire Protection Central Core
The project scope is to add fire protection to various areas of the hospital that currently do not have protection. Those areas are located on different levels and different wings of the building. It also includes replacing the existing fire pump and a main horizontal fire lines connected to the new pump. The project schedule requires that it be completed by July 1, 2028.
Place Order
Name
Spec Sheet(Click to View)
File Size / Approx. Download Time (56k Modem)
Description
DPR Viewable Specs
DPR_Viewable_Specs.pdf
18232 KB / 42m 24s