UMMC Fire Protection Central Core
The project scope is to add fire protection to various areas of the hospital that currently do not have protection. Those areas are located on different levels and different wings of the building. It also includes replacing the existing fire pump and a main horizontal fire lines connected to the new pump. The project schedule requires that it be completed by July 1, 2028.