Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
GS# 362-066 West Lot Improvements (Demolition and Abatement)

Demolish and dispose of all of the building and site construction associated with the old Sun-N-Sand hotel that is located immediately to the west of the Woolfolk Office Building in downtown Jackson, MS. In general, this includes all construction located within the existing chain link fencing. The work includes all building construction, pavement construction, asbestos abatement, removal of electrical/mechanical/ plumbing and capping of all utilities. The site will then be graded, and erosion control will be put in place. See plans and specifications for a complete description of work requirements.
            
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 G10
COVER SHEET
001-G10_COVER_SHEET.tiff
1298 KB
 002
 A10
GENERAL ARCHITECTURAL NOTES
002-A10_GENERAL_ARCHITECTURAL_NOTES.tiff
466 KB
 003
 A11
DEMOLITION PLAN WITH DEMOLITION NOTES
003-A11_DEMOLITION_PLAN_WITH_DEMOLITION_NOTES.tiff
5009 KB
 004
 C0.1
GENERAL NOTES AND INDEX OF CIVIL DRAWING
004-C0.1_GENERAL_NOTES_AND_INDEX_OF_CIVIL_DRAWING.tiff
696 KB
 005
 C1.0
BOUNDARY AND TOPOGRAPHIC SURVEY OF THE OLD SUN N SAND HOTEL
005-C1.0_BOUNDARY_AND_TOPOGRAPHIC_SURVEY_OF_THE_OLD_SUN_N_SAND_HOTEL.tiff
1038 KB
 006
 C1.1
CONSTRUCTION TRUCK ROUTE PLAN
006-C1.1_CONSTRUCTION_TRUCK_ROUTE_PLAN.tiff
17411 KB
 007
 C2.0
SITE DEMOLITION PLAN
007-C2.0_SITE_DEMOLITION_PLAN.tiff
1043 KB
 008
 C3.0
SITE ROUGH GRADING AND DRAINAGE PLAN
008-C3.0_SITE_ROUGH_GRADING_AND_DRAINAGE_PLAN.tiff
797 KB
 009
 C4.0
EROSION CONTROL PLAN
009-C4.0_EROSION_CONTROL_PLAN.tiff
804 KB
 010
 C5.0
MISCELLANEOUS EROSION CONTROL DETAILS
010-C5.0_MISCELLANEOUS_EROSION_CONTROL_DETAILS.tiff
664 KB