Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
GS# 354-050 Tenant Improvement-DMH (Eighth and Ninth Floors) Robert E. Lee Building
Renovation of the 8th and 9th floors of the Robert E. Lee building in downtown Jackson, MS. Work includes, but is not limited to, demolition of existing interior walls, construction of new gyp. bd. interior walls and glass entrances, mechanical/electrical work, plaster repair on existing walls, painting, etc. Other floors will be occupied during construction. Alternate adds to work renovation of existing 8th and 9th floor restrooms.
#
Sheet #
Sheet Name
Image Name (Click To View)
File Size
001
TS
BUILDING CODE-DOCUMENT WALL TYPES
001-TS_BUILDING_CODE-DOCUMENT_WALL_TYPES.tiff
921 KB
002
2.0
DEMOLITION PLANS AND DEMOLITION RCP
002-2.0_DEMOLITION_PLANS_AND_DEMOLITION_RCP.tiff
927 KB
003
2.1
EIGHTH FLOOR-PLAN AND INTERIOR ELEVATIONS
003-2.1_EIGHTH_FLOOR-PLAN_AND_INTERIOR_ELEVATIONS.tiff
1028 KB
004
2.2
NINTH FLOOR PLAN AND INTERIOR ELEVATIONS
004-2.2_NINTH_FLOOR_PLAN_AND_INTERIOR_ELEVATIONS.tiff
1021 KB
005
2.3
ALT.1 ENLARGED-RESTROOM PLANS AND ELEVATIONS
005-2.3_ALT.1_ENLARGED-RESTROOM_PLANS_AND_ELEVATIONS.tiff
1000 KB
006
3.0
DOOR FINISH SCHEDULE DOOR DETAILS
006-3.0_DOOR_FINISH_SCHEDULE_DOOR_DETAILS.tiff
950 KB
007
4.0
REFLECTED CEILING PLANS
007-4.0_REFLECTED_CEILING_PLANS.tiff
939 KB
008
P0.1
PLUMBING LEGEND GENERAL NOTES
008-P0.1_PLUMBING_LEGEND_GENERAL_NOTES.tiff
650 KB
009
P1.0
PLUMBING RENOVATION 8TH FLOOR PLAN
009-P1.0_PLUMBING_RENOVATION_8TH_FLOOR_PLAN.tiff
640 KB
010
P1.1
PLUMBING RENOVATION 9TH FLOOR PLAN
010-P1.1_PLUMBING_RENOVATION_9TH_FLOOR_PLAN.tiff
634 KB
011
P1.2
ENLARGED 8TH 9TH FLOOR PLAN ALT.1 FIXTURE SCHEDULE
011-P1.2_ENLARGED_8TH_9TH_FLOOR_PLAN_ALT.1_FIXTURE_SCHEDULE.tiff
640 KB
012
M0.1
HVAC LEGEND GENERAL NOTES
012-M0.1_HVAC_LEGEND_GENERAL_NOTES.tiff
766 KB
013
MD1.1
HVAC+DEMOLITION 8TH FLOOR PLAN
013-MD1.1_HVAC+DEMOLITION_8TH_FLOOR_PLAN.tiff
570 KB
014
MD1.2
HVAC DEMOLITION 9TH FLOOR PLAN
014-MD1.2_HVAC_DEMOLITION_9TH_FLOOR_PLAN.tiff
572 KB
015
MD1.3
HVAC PIPING DEMOLITION PLAN 8TH FLOOR
015-MD1.3_HVAC_PIPING_DEMOLITION_PLAN_8TH_FLOOR.tiff
582 KB
016
MD1.4
HVAC PIPING DEMOLITION PLAN 9TH FLOOR
016-MD1.4_HVAC_PIPING_DEMOLITION_PLAN_9TH_FLOOR.tiff
566 KB
017
M1.1
HVAC RENOVATION 8TH FLOOR PLAN
017-M1.1_HVAC_RENOVATION_8TH_FLOOR_PLAN.tiff
653 KB
018
M1.2
HVAC RENOVATION 9TH FLOOR PLAN
018-M1.2_HVAC_RENOVATION_9TH_FLOOR_PLAN.tiff
645 KB
019
MP1.1
HVAC PIPING RENOVATION 8TH FLOOR
019-MP1.1_HVAC_PIPING_RENOVATION_8TH_FLOOR.tiff
652 KB
020
MP1.2
HVAC PIPING RENOVATION 9TH FLOOR
020-MP1.2_HVAC_PIPING_RENOVATION_9TH_FLOOR.tiff
650 KB
021
M5.1
DETAILS
021-M5.1_DETAILS.tiff
685 KB
022
M6.1
WATER SOURCE HEAT PUMP 8TH FLOOR CHART
022-M6.1_WATER_SOURCE_HEAT_PUMP_8TH_FLOOR_CHART.tiff
608 KB
023
M6.2
WATER SOURCE HEAT PUMP 9TH FLOOR CHART AIR DISTRIBUTION DEVICE SCHEDULE CHART
023-M6.2_WATER_SOURCE_HEAT_PUMP_9TH_FLOOR_CHART_AIR_DISTRIBUTION_DEVICE_SCHEDULE_CHART.tiff
685 KB
024
M7.1
CONTROL POINTS SEQUENCE OF OPERATIONS LEGEND
024-M7.1_CONTROL_POINTS_SEQUENCE_OF_OPERATIONS_LEGEND.tiff
673 KB
025
M7.2
WATER SOURCE HEAT PUMP SEQUENCE OF OPERATION
025-M7.2_WATER_SOURCE_HEAT_PUMP_SEQUENCE_OF_OPERATION.tiff
543 KB
026
E100
ELECTRICAL LEGEND
026-E100_ELECTRICAL_LEGEND.tiff
350 KB
027
E200
LIGHTING PLAN 8TH FLOOR
027-E200_LIGHTING_PLAN_8TH_FLOOR.tiff
259 KB
028
E201
POWER PLAN 8TH FLOOR
028-E201_POWER_PLAN_8TH_FLOOR.tiff
275 KB
029
E202
COMMUNICATIONS PLAN 8TH FLOOR
029-E202_COMMUNICATIONS_PLAN_8TH_FLOOR.tiff
261 KB
030
E300
LIGHTING PLAN 9TH FLOOR
030-E300_LIGHTING_PLAN_9TH_FLOOR.tiff
259 KB
031
E301
POWER PLAN 9TH FLOOR
031-E301_POWER_PLAN_9TH_FLOOR.tiff
273 KB
032
E302
COMMUNICATIONS PLAN 9TH FLOOR
032-E302_COMMUNICATIONS_PLAN_9TH_FLOOR.tiff
259 KB
033
E400
DETAILS
033-E400_DETAILS.tiff
347 KB
034
E500
DETAILS
034-E500_DETAILS.tiff
234 KB
035
E600
POWER RISER DIAGRAM CIRCUIT SCHEDULE
035-E600_POWER_RISER_DIAGRAM_CIRCUIT_SCHEDULE.tiff
299 KB