Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
GS# 323-016 Water & Wastewater Improvements-South MS Correctional Institute

The South Mississippi Correctional Institute (SMSCI) has two wastewater sludge lagoons that have been used for the past 24 years for sludge management. It is estimated that up to 331 dry tons of sludge is present in the lagoons. This project will remove the sludge, dewater the sludge and haul the dewatered sludge to a Subtitle D Landfill for disposal. In general, the project will include:Regrading and gravel resurfacing approximately 1378 feet of an existing haul road. Construction of approximately 1600 feet of new gravel haul road Installation of two 15” diameter RCP culverts and one 48” diameter culvert Dredging sludge from the two wastewater sludge lagoons Providing mechanical dewatering of the sludge. Mechanical sludge dewatering facilities will be provided by the Contractor and removed from the site at completion.Transportation and disposal of the dewatered sludge at a Subtitle D Landfill Providing all power and pumps needed to operate the sludge dewatering equipment Installing stormwater BMPs and Stormwater Management during construction Project Management and Project Scheduling Complying with all safety and security requirements of the Mississippi Department of Corrections.
            
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 G1
COVER SHEET
001-G1_COVER_SHEET.tiff
377 KB
 002
 1.0
EXISTING OVERALL SITE PLAN
002-1.0_EXISTING_OVERALL_SITE_PLAN.tiff
3554 KB
 003
 2.0
EXISTING WWTP SITE PLAN
003-2.0_EXISTING_WWTP_SITE_PLAN.tiff
3226 KB
 004
 3.0
EXISTING NEW HAUL ROAD SITE PLAN
004-3.0_EXISTING_NEW_HAUL_ROAD_SITE_PLAN.tiff
3522 KB
 005
 4.0
EXISTING HAUL ROAD SITE PLAN
005-4.0_EXISTING_HAUL_ROAD_SITE_PLAN.tiff
3375 KB
 006
 5.0
PROPOSED WWTP SITE PLAN
006-5.0_PROPOSED_WWTP_SITE_PLAN.tiff
3313 KB
 007
 6.0
PROPOSED NEW HAUL ROAD SITE PLAN
007-6.0_PROPOSED_NEW_HAUL_ROAD_SITE_PLAN.tiff
2702 KB
 008
 7.0
PROPOSED HAUL ROAD SITE PLAN
008-7.0_PROPOSED_HAUL_ROAD_SITE_PLAN.tiff
2623 KB
 009
 8.0
SAMPLE LOCATIONS
009-8.0_SAMPLE_LOCATIONS.tiff
2835 KB
 010
 9.0
WWTP CONSTRUCTION LIMITS
010-9.0_WWTP_CONSTRUCTION_LIMITS.tiff
3394 KB
 011
 10.0
STORM WATER MANAGEMENT PLAN
011-10.0_STORM_WATER_MANAGEMENT_PLAN.tiff
3458 KB
 012
 11.0
ROAD DETAIL DRAWINGS
012-11.0_ROAD_DETAIL_DRAWINGS.tiff
176 KB
 013
 12.0
BMP DETAIL DRAWINGS
013-12.0_BMP_DETAIL_DRAWINGS.tiff
202 KB
 014
 13.0
PROCESS FLOW SCHEMATIC 1
014-13.0_PROCESS_FLOW_SCHEMATIC_1.tiff
417 KB
 015
 14.0
PROCESS FLOW SCHEMATIC 2
015-14.0_PROCESS_FLOW_SCHEMATIC_2.tiff
363 KB
 016
 15.0
PROCESS FLOW SCHEMATIC 3
016-15.0_PROCESS_FLOW_SCHEMATIC_3.tiff
434 KB