Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
GS# 323-016 Water & Wastewater Improvements-South MS Correctional Institute
The South Mississippi Correctional Institute (SMSCI) has two wastewater sludge lagoons that have been used for the past 24 years for sludge management. It is estimated that up to 331 dry tons of sludge is present in the lagoons. This project will remove the sludge, dewater the sludge and haul the dewatered sludge to a Subtitle D Landfill for disposal. In general, the project will include:Regrading and gravel resurfacing approximately 1378 feet of an existing haul road. Construction of approximately 1600 feet of new gravel haul road Installation of two 15” diameter RCP culverts and one 48” diameter culvert Dredging sludge from the two wastewater sludge lagoons Providing mechanical dewatering of the sludge. Mechanical sludge dewatering facilities will be provided by the Contractor and removed from the site at completion.Transportation and disposal of the dewatered sludge at a Subtitle D Landfill Providing all power and pumps needed to operate the sludge dewatering equipment Installing stormwater BMPs and Stormwater Management during construction Project Management and Project Scheduling Complying with all safety and security requirements of the Mississippi Department of Corrections.
Name
Delivery Method
Date
Addendum_#_1.pdf
2/19/2020
Addendum_#_2.pdf
3/11/2020