Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
JMAA PROJECT NO. 004-18C (Re-Bid)
Construction and Related Services In Connection With International Drive Rehabilitation At The Jackson-Medgar Wiley Evers International Airport
Place Order
#
Sheet #
Sheet Name
Image Name (Click To View)
File Size
001
T1
TITLE SHEET
001-T1_TITLE_SHEET.tiff
563 KB
002
D1-1
DETAILED INDEX ROADWAY
002-D1-1_DETAILED_INDEX_ROADWAY.tiff
579 KB
003
GN-1
GENERAL NOTES
003-GN-1_GENERAL_NOTES.tiff
597 KB
004
GN-2
GENERAL NOTES
004-GN-2_GENERAL_NOTES.tiff
489 KB
005
TS-1
TYPICAL SECTION INTERNATIONAL DRIVE
005-TS-1_TYPICAL_SECTION_INTERNATIONAL_DRIVE.tiff
458 KB
006
TS-2
TYPICAL SECTION INTERNATIONAL DRIVE
006-TS-2_TYPICAL_SECTION_INTERNATIONAL_DRIVE.tiff
457 KB
007
SQ-1
SUMMARY OF QUANTITIES
007-SQ-1_SUMMARY_OF_QUANTITIES.tiff
613 KB
008
SQ-2
SUMMARY OF QUANTITIES
008-SQ-2_SUMMARY_OF_QUANTITIES.tiff
505 KB
009
EQ-1
ESTIMATED QUANTITY EARTHWORK AND EROSION CONTROL
009-EQ-1_ESTIMATED_QUANTITY_EARTHWORK_AND_EROSION_CONTROL.tiff
455 KB
010
EQ-2
ESTIMATED QUANTITY PAVEMENT MARKING
010-EQ-2_ESTIMATED_QUANTITY_PAVEMENT_MARKING.tiff
550 KB
011
EQ-3
ESTIMATED QUANTITY CONSTRUCTION SIGNAGE
011-EQ-3_ESTIMATED_QUANTITY_CONSTRUCTION_SIGNAGE.tiff
729 KB
012
PP-1
STA.5+00 TO STA.20+00
012-PP-1_STA.5+00_TO_STA.20+00.tiff
588 KB
013
PP-2
STA 20+00 TO STA 35+00
013-PP-2_STA_20+00_TO_STA_35+00.tiff
570 KB
014
PP-3
STA 35+00 TO STA 50+00
014-PP-3_STA_35+00_TO_STA_50+00.tiff
595 KB
015
PP-4
STA 50+00 TO STA 65+00
015-PP-4_STA_50+00_TO_STA_65+00.tiff
596 KB
016
PP-5
STA 65+00 TO STA 78+00
016-PP-5_STA_65+00_TO_STA_78+00.tiff
598 KB
017
PP-5A
STA 10+00 TO STA 15+38.913
017-PP-5A_STA_10+00_TO_STA_15+38.913.tiff
559 KB
018
PP-6
STA 78+00 TO STA 85+00
018-PP-6_STA_78+00_TO_STA_85+00.tiff
577 KB
019
PP-6A
STA 10+00 TO STA 15+20.378
019-PP-6A_STA_10+00_TO_STA_15+20.378.tiff
551 KB
020
PP-7
STA 85+00 TO STA 99+60.870
020-PP-7_STA_85+00_TO_STA_99+60.870.tiff
600 KB
021
PMD-1
PAVEMENT MARKING DETAILS
021-PMD-1_PAVEMENT_MARKING_DETAILS.tiff
556 KB
022
PMD-2
PAVEMENT MARKING DETAILS
022-PMD-2_PAVEMENT_MARKING_DETAILS.tiff
549 KB
023
PMD-3
PAVEMENT MARKING DETAILS
023-PMD-3_PAVEMENT_MARKING_DETAILS.tiff
547 KB
024
PMD-4
PAVEMENT MARKING DETAILS
024-PMD-4_PAVEMENT_MARKING_DETAILS.tiff
550 KB
025
PMD-5
PAVEMENT MARKING DETAILS
025-PMD-5_PAVEMENT_MARKING_DETAILS.tiff
559 KB
026
PMD-6
PAVEMENT MARKING DETAILS
026-PMD-6_PAVEMENT_MARKING_DETAILS.tiff
593 KB
027
PMD-7
PAVEMENT MARKING DETAILS
027-PMD-7_PAVEMENT_MARKING_DETAILS.tiff
569 KB
028
PMD-8
PAVEMENT MARKING DETAILS
028-PMD-8_PAVEMENT_MARKING_DETAILS.tiff
662 KB
029
PMD-9
PAVEMENT MARKING DETAILS
029-PMD-9_PAVEMENT_MARKING_DETAILS.tiff
579 KB
030
CS-1
CONSTRUCTION SIGNAGE
030-CS-1_CONSTRUCTION_SIGNAGE.tiff
447 KB
031
SC-1
SURVEY CONTROL DATA SHEET
031-SC-1_SURVEY_CONTROL_DATA_SHEET.tiff
487 KB
032
DD-1
DISSIPATOR DETAILS
032-DD-1_DISSIPATOR_DETAILS.tiff
486 KB
033
PM-1
PAVEMENT MARKING DETAILS FOR 2-LANE AND4-LANE DIVIDED ROADWAYS
033-PM-1_PAVEMENT_MARKING_DETAILS_FOR_2-LANE_AND4-LANE_DIVIDED_ROADWAYS.tiff
557 KB
034
PM-5
PAVEMENT MARKING LEGEND DETAILS
034-PM-5_PAVEMENT_MARKING_LEGEND_DETAILS.tiff
1108 KB
035
PM-6
PAVEMENT MARKING LEGEND DETAILS
035-PM-6_PAVEMENT_MARKING_LEGEND_DETAILS.tiff
907 KB
036
PM-8
4-LANE TO 2-LANE TRANSITION AT INTERCHANGE
036-PM-8_4-LANE_TO_2-LANE_TRANSITION_AT_INTERCHANGE.tiff
569 KB
037
ECD-1
TYPICAL TEMPORARY EROSION SEDIMENT CONTROL APPLICATIONS
037-ECD-1_TYPICAL_TEMPORARY_EROSION_SEDIMENT_CONTROL_APPLICATIONS.tiff
699 KB
038
ECD-2
DETAILS OF SEDIMENT BARRIER APPLICATIONS
038-ECD-2_DETAILS_OF_SEDIMENT_BARRIER_APPLICATIONS.tiff
626 KB
039
ECD-3
DETAILS OF SILT FENCE INSTALLATION
039-ECD-3_DETAILS_OF_SILT_FENCE_INSTALLATION.tiff
546 KB
040
ECD-4
DITCH CHECK STRUCTURES TYPICAL APPLICATIONS AND DETAILS
040-ECD-4_DITCH_CHECK_STRUCTURES_TYPICAL_APPLICATIONS_AND_DETAILS.tiff
574 KB
041
ECD-16
STABILIZED CONSTRUCTION ENTRANCE
041-ECD-16_STABILIZED_CONSTRUCTION_ENTRANCE.tiff
530 KB
042
DT-1
DETAILS OF TYPICAL DITCH TREATMENT
042-DT-1_DETAILS_OF_TYPICAL_DITCH_TREATMENT.tiff
622 KB
043
SE-2E
SUPERELEVATION TRANSITION ROTATION ABOUT CENTERLINE
043-SE-2E_SUPERELEVATION_TRANSITION_ROTATION_ABOUT_CENTERLINE.tiff
513 KB
044
TCP-1
TRAFFIC CONTROL PLAN WITH FLAGGER
044-TCP-1_TRAFFIC_CONTROL_PLAN_WITH_FLAGGER.tiff
467 KB
045
TCP-2
TRAFFIC CONTROL PLAN FOR POSTED SPEED LIMIT LESS THAN 65 MPH
045-TCP-2_TRAFFIC_CONTROL_PLAN_FOR_POSTED_SPEED_LIMIT_LESS_THAN_65_MPH.tiff
495 KB
046
TCP-12
TRAFFIC CONTROL PLAN UNEVEN PAVEMENT DETAILS
046-TCP-12_TRAFFIC_CONTROL_PLAN_UNEVEN_PAVEMENT_DETAILS.tiff
483 KB
047
TCP-13
TEMPORARY STRIPING FOR TRAFFIC CONTROL
047-TCP-13_TEMPORARY_STRIPING_FOR_TRAFFIC_CONTROL.tiff
553 KB
048
TCP-16
TRAFFIC CONTROL DETAILS
048-TCP-16_TRAFFIC_CONTROL_DETAILS.tiff
558 KB
049
SD-2
DRIVEWAYS INTEGRAL CURB & SIDEWALK
049-SD-2_DRIVEWAYS_INTEGRAL_CURB_&_SIDEWALK.tiff
659 KB
050
CR-1
CURB RAMPS RAMP DESIGN ELEMENT
050-CR-1_CURB_RAMPS_RAMP_DESIGN_ELEMENT.tiff
750 KB
051
CR-2
CURB RAMPS PLACEMENT DETAILS
051-CR-2_CURB_RAMPS_PLACEMENT_DETAILS.tiff
662 KB