Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
80 Inmate Housing Addition to the Marshall County Justice Complex

The work required under this contract consists of the construction of a new 80 Inmate Housing Unit of approximately 17645 square feet with an attached sally port of 4795 square feet. The work shall consist of concrete slab foundation, security grade concrete block walls, bar joist roof structure with metal roof deck, insulation, recovery board and metal screw down roofing. The exterior of the entire facility shall be pre-engineered metal building metal siding on furring with rigid wall insulation over the security concrete block walls. The sally port shall be a pre-engineered metal building with metal siding on wall girts, insulation, metal structural framing, roof insulation, and metal screw down roofing on roof purlins. All interior construction shall be sealed concrete floors, security rated concrete block walls with paint finish, painted cement board ceilings either attached to bottom of roof structure or suspended or lay in acoustical tile ceilings. Mechanical work shall consist of ground mounted packaged air conditioning units that ducted into the building with separate smoke evacuation units in each dorm space. Plumbing standard construction run to 5’-0” beyond the building perimeter. Electrical work is standard and security type for power, communications, and building systems control. Site work shall include all paving, sidewalks, underground utilities from 5’-0” outside the building perimeter to tie into city services.
            
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 CS
COVER SHEET
001-CS_COVER_SHEET.TIF
200 KB
 002
 G001
ABBREVIATIONS GRAPHIC SYMBOLS INDEX OF DRAWINGS
002-G001_ABBREVIATIONS_GRAPHIC_SYMBOLS_INDEX_OF_DRAWINGS.TIF
770 KB
 003
 C1
EXISTING SITE PLAN
003-C1_EXISTING_SITE_PLAN.TIF
495 KB
 004
 C2
SITE LAYOUT PLAN
004-C2_SITE_LAYOUT_PLAN.TIF
410 KB
 005
 C3
SITE GRADING PLAN
005-C3_SITE_GRADING_PLAN.TIF
699 KB
 006
 C4
SITE UTILITIES PLAN
006-C4_SITE_UTILITIES_PLAN.TIF
534 KB
 007
 C5
SITE DETAILS
007-C5_SITE_DETAILS.TIF
494 KB
 008
 C6
SITE DETAILS
008-C6_SITE_DETAILS.TIF
488 KB
 009
 D101
DEMOLITION FLOOR PLAN
009-D101_DEMOLITION_FLOOR_PLAN.TIF
632 KB
 010
 A001
LIFE SAFETY FLOOR PLAN
010-A001_LIFE_SAFETY_FLOOR_PLAN.TIF
660 KB
 011
 A002
WALL TYPE SCHEDULE
011-A002_WALL_TYPE_SCHEDULE.TIF
682 KB
 012
 A100
OVERALL COMPLEX PLAN
012-A100_OVERALL_COMPLEX_PLAN.TIF
1626 KB
 013
 A100.1
OVERALL FLOOR PLAN
013-A100.1_OVERALL_FLOOR_PLAN.TIF
1044 KB
 014
 A101
PARTIAL FLOOR PLAN
014-A101_PARTIAL_FLOOR_PLAN.TIF
1182 KB
 015
 A102
PARTIAL FLOOR PLAN
015-A102_PARTIAL_FLOOR_PLAN.TIF
1198 KB
 016
 A103
PARTIAL FLOOR PLAN
016-A103_PARTIAL_FLOOR_PLAN.TIF
1145 KB
 017
 A104
PARTIAL FLOOR PLAN
017-A104_PARTIAL_FLOOR_PLAN.TIF
1026 KB
 018
 A105
REFLECTED CEILING PLAN AND DETAILS
018-A105_REFLECTED_CEILING_PLAN_AND_DETAILS.TIF
1167 KB
 019
 A106
ROOF PLAN AND DETAILS
019-A106_ROOF_PLAN_AND_DETAILS.TIF
1208 KB
 020
 A201
EXTERIOR ELEVATIONS
020-A201_EXTERIOR_ELEVATIONS.TIF
923 KB
 021
 A203
BUILDING CROSS SECTION
021-A203_BUILDING_CROSS_SECTION.TIF
1031 KB
 022
 A301
WALL SECTIONS
022-A301_WALL_SECTIONS.TIF
857 KB
 023
 A302
WALL SECTIONS
023-A302_WALL_SECTIONS.TIF
963 KB
 024
 A303
WALL SECTIONS
024-A303_WALL_SECTIONS.TIF
1012 KB
 025
 A304
WALL SECTIONS
025-A304_WALL_SECTIONS.TIF
972 KB
 026
 A305
WALL SECTIONS
026-A305_WALL_SECTIONS.TIF
748 KB
 027
 A306
WALL SECTIONS
027-A306_WALL_SECTIONS.TIF
902 KB
 028
 A320
ROOFING DETAILS
028-A320_ROOFING_DETAILS.TIF
595 KB
 029
 A401
SECURITY AND COLUMN DETAILS
029-A401_SECURITY_AND_COLUMN_DETAILS.TIF
807 KB
 030
 A402
COLUMN DETAILS
030-A402_COLUMN_DETAILS.TIF
751 KB
 031
 A501
INTERIOR ELEVATIONS MILLWORK DETAILS
031-A501_INTERIOR_ELEVATIONS_MILLWORK_DETAILS.TIF
894 KB
 032
 A502
MILLWORK DETAILS
032-A502_MILLWORK_DETAILS.TIF
729 KB
 033
 A601
DOOR WINDOW SCHEDULE AND DETAILS
033-A601_DOOR_WINDOW_SCHEDULE_AND_DETAILS.TIF
1147 KB
 034
 A602
DOOR WINDOW DETAILS
034-A602_DOOR_WINDOW_DETAILS.TIF
751 KB
 035
 A603
DOOR WINDOW DETAILS
035-A603_DOOR_WINDOW_DETAILS.TIF
661 KB
 036
 A901
FINISH SCHEDULE
036-A901_FINISH_SCHEDULE.TIF
854 KB
 037
 K1.1
KITCHEN EQUIPMENT FLOOR PLAN
037-K1.1_KITCHEN_EQUIPMENT_FLOOR_PLAN.TIF
266 KB
 038
 K1.2
KITCHEN PLUMBING FLOOR PLAN
038-K1.2_KITCHEN_PLUMBING_FLOOR_PLAN.TIF
341 KB
 039
 K1.3
KITCHEN ELECTRICAL FLOOR PLAN
039-K1.3_KITCHEN_ELECTRICAL_FLOOR_PLAN.TIF
284 KB
 040
 K3.1
FOOD SERVICE PLUMBING ELECTRICAL SCHEDULE
040-K3.1_FOOD_SERVICE_PLUMBING_ELECTRICAL_SCHEDULE.TIF
607 KB
 041
 K4.1
EXHAUST HOOD INFO AND INSTALL INSTRUCTIONS
041-K4.1_EXHAUST_HOOD_INFO_AND_INSTALL_INSTRUCTIONS.TIF
368 KB
 042
 K4.2
EXHAUST HOOD PLAN
042-K4.2_EXHAUST_HOOD_PLAN.TIF
227 KB
 043
 K4.3
EXHAUST HOOD DETAILS
043-K4.3_EXHAUST_HOOD_DETAILS.TIF
304 KB
 044
 K4.4
EXHAUST HOOD DETAILS
044-K4.4_EXHAUST_HOOD_DETAILS.TIF
338 KB
 045
 K4.5
EXHAUST HOOD WIRING FIRE SUPPRESSION PIPING
045-K4.5_EXHAUST_HOOD_WIRING_FIRE_SUPPRESSION_PIPING.TIF
273 KB
 046
 K4.6
ELECTRICAL PACKAGES
046-K4.6_ELECTRICAL_PACKAGES.TIF
345 KB
 047
 4.7
EXHAUST DUCTWORK
047-4.7_EXHAUST_DUCTWORK.TIF
309 KB
 048
 K4.8
INSTRUCTIONS DIRECTIVES FOR DUCTWORK
048-K4.8_INSTRUCTIONS_DIRECTIVES_FOR_DUCTWORK.TIF
396 KB
 049
 K4.9
COOLER FREEZER PLANS AND DETAILS
049-K4.9_COOLER_FREEZER_PLANS_AND_DETAILS.TIF
463 KB
 050
 S100
STRUCTURAL GENERAL NOTES
050-S100_STRUCTURAL_GENERAL_NOTES.TIF
809 KB
 051
 S101
FOUNDATION AND FLOOR FRAMING PLAN
051-S101_FOUNDATION_AND_FLOOR_FRAMING_PLAN.TIF
787 KB
 052
 S102
ROOF FRAMING PLAN
052-S102_ROOF_FRAMING_PLAN.TIF
569 KB
 053
 S201
CMU WALL DETAILS
053-S201_CMU_WALL_DETAILS.TIF
416 KB
 054
 S202
FRAMING DETAILS
054-S202_FRAMING_DETAILS.TIF
444 KB
 055
 S301
STEEL DETAILS
055-S301_STEEL_DETAILS.TIF
403 KB
 056
 S302
STEEL DETAILS
056-S302_STEEL_DETAILS.TIF
152 KB
 057
 P101
FLOOR PLAN SANITARY
057-P101_FLOOR_PLAN_SANITARY.TIF
595 KB
 058
 P201
FLOOR PLAN DOMESTIC WATER GAS
058-P201_FLOOR_PLAN_DOMESTIC_WATER_GAS.TIF
630 KB
 059
 M101
FLOOR PLAN HVAC
059-M101_FLOOR_PLAN_HVAC.TIF
873 KB
 060
 M201
MECHANICAL SCHEDULES AND DETAILS
060-M201_MECHANICAL_SCHEDULES_AND_DETAILS.TIF
636 KB
 061
 FP101
FLOOR PLAN FIRE PROTECTION
061-FP101_FLOOR_PLAN_FIRE_PROTECTION.TIF
558 KB
 062
 E001
ELECTRICAL LEGENDS
062-E001_ELECTRICAL_LEGENDS.TIF
737 KB
 063
 E002
ONE LINE DIAGRAM
063-E002_ONE_LINE_DIAGRAM.TIF
268 KB
 064
 E003
PANEL SCHEDULES
064-E003_PANEL_SCHEDULES.TIF
467 KB
 065
 E004
PANEL SCHEDULES
065-E004_PANEL_SCHEDULES.TIF
501 KB
 066
 E005
ELECTRICAL SCHEDULES
066-E005_ELECTRICAL_SCHEDULES.TIF
671 KB
 067
 E006
ELECTRICAL DETAILS
067-E006_ELECTRICAL_DETAILS.TIF
448 KB
 068
 ES101
ELECTRICAL SITE PLAN
068-ES101_ELECTRICAL_SITE_PLAN.TIF
1736 KB
 069
 E101
FLOOR PLAN LIGHTING
069-E101_FLOOR_PLAN_LIGHTING.TIF
2192 KB
 070
 E201
FLOOR PLAN POWER
070-E201_FLOOR_PLAN_POWER.TIF
1905 KB
 071
 E202
FLOOR PLAN POWER CONNECTIONS
071-E202_FLOOR_PLAN_POWER_CONNECTIONS.TIF
1963 KB
 072
 E301
FLOOR PLAN SPECIAL SYSTEMS
072-E301_FLOOR_PLAN_SPECIAL_SYSTEMS.TIF
1873 KB
 073
 E302
FLOOR PLAN FIRE ALARM
073-E302_FLOOR_PLAN_FIRE_ALARM.TIF
1875 KB