Planroom Menu
Jackson Blueprint Home
Planroom Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
80 Inmate Housing Addition to the Marshall County Justice Complex
The work required under this contract consists of the construction of a new 80 Inmate Housing Unit of approximately 17645 square feet with an attached sally port of 4795 square feet. The work shall consist of concrete slab foundation, security grade concrete block walls, bar joist roof structure with metal roof deck, insulation, recovery board and metal screw down roofing. The exterior of the entire facility shall be pre-engineered metal building metal siding on furring with rigid wall insulation over the security concrete block walls. The sally port shall be a pre-engineered metal building with metal siding on wall girts, insulation, metal structural framing, roof insulation, and metal screw down roofing on roof purlins. All interior construction shall be sealed concrete floors, security rated concrete block walls with paint finish, painted cement board ceilings either attached to bottom of roof structure or suspended or lay in acoustical tile ceilings. Mechanical work shall consist of ground mounted packaged air conditioning units that ducted into the building with separate smoke evacuation units in each dorm space. Plumbing standard construction run to 5’-0” beyond the building perimeter. Electrical work is standard and security type for power, communications, and building systems control. Site work shall include all paving, sidewalks, underground utilities from 5’-0” outside the building perimeter to tie into city services.
Name
Spec Sheet(Click to View)
File Size / Approx. Download Time (56k Modem)
Description
VIEWABLE SPECS
001-DPR_VIEWABLE_SPECS.pdf
58114 KB / 2h 15m 7s