Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
GS# 106-257 Edna Horton Renovation MVSU

The Edna Horton Renovation includes repair and total replacement of the exterior envelope, including all exterior walls, window system, and roof, as well as full asbestos abatement and finish replacement throughout the building. The scope of the project also includes upgrade and replacement of all building mechanical and electrical systems, and addition of a fire protection system
            
 #  Sheet # Sheet Name Image Name (Click To View)
File Size
 001
 G001
COVER SHEET
001-G001_COVER_SHEET.TIF
885 KB
 002
 GOO2
LIFE SAFETY PLANS
002-GOO2_LIFE_SAFETY_PLANS.TIF
527 KB
 003
 D101
DEMOLITION FLOOR PLAN
003-D101_DEMOLITION_FLOOR_PLAN.TIF
1510 KB
 004
 D102
DEMOLITION FLOOR PLAN
004-D102_DEMOLITION_FLOOR_PLAN.TIF
1349 KB
 005
 D103
DEMOLITION ROOF PLAN
005-D103_DEMOLITION_ROOF_PLAN.TIF
781 KB
 006
 D201
DEMOLITION EXTERIOR ELEVATIONS
006-D201_DEMOLITION_EXTERIOR_ELEVATIONS.TIF
1141 KB
 007
 D202
DEMOLITION EXTERIOR ELEVATIONS
007-D202_DEMOLITION_EXTERIOR_ELEVATIONS.TIF
1105 KB
 008
 S1.0
ABBREVIATIONS DESIGN CRITERIA STRUCTURAL NOTES
008-S1.0_ABBREVIATIONS_DESIGN_CRITERIA_STRUCTURAL_NOTES.TIF
831 KB
 009
 S1.1
QUALITY ASSURANCE PROGRAM
009-S1.1_QUALITY_ASSURANCE_PROGRAM.TIF
287 KB
 010
 S1.2
COLD FORMED STUD SCHEDULES STANDARD DETAILS
010-S1.2_COLD_FORMED_STUD_SCHEDULES_STANDARD_DETAILS.TIF
492 KB
 011
 S2.0
STRUCTRUAL FIRST FLOOR WALL PLAN
011-S2.0_STRUCTRUAL_FIRST_FLOOR_WALL_PLAN.TIF
403 KB
 012
 S2.1
STRUCTURAL UPPER FLOOR WALL PLANS
012-S2.1_STRUCTURAL_UPPER_FLOOR_WALL_PLANS.TIF
346 KB
 013
 S3.0
WALL FRAMING SECTIONS
013-S3.0_WALL_FRAMING_SECTIONS.TIF
812 KB
 014
 S3.1
WALL FRAMING SECTIONS
014-S3.1_WALL_FRAMING_SECTIONS.TIF
523 KB
 015
 S3.2
WALL FRAMING SECTIONS
015-S3.2_WALL_FRAMING_SECTIONS.TIF
537 KB
 016
 A001
ARCHITECTURAL SITE PLAN
016-A001_ARCHITECTURAL_SITE_PLAN.TIF
863 KB
 017
 A101
FIRST FLOOR PLAN
017-A101_FIRST_FLOOR_PLAN.TIF
953 KB
 018
 A102
UPPER FLOOR PLANS
018-A102_UPPER_FLOOR_PLANS.TIF
783 KB
 019
 A103
PENTHOUSE AND ROOF PLANS
019-A103_PENTHOUSE_AND_ROOF_PLANS.TIF
707 KB
 020
 A121
FIRST FLOOR REFLECTED CEILING PLAN
020-A121_FIRST_FLOOR_REFLECTED_CEILING_PLAN.TIF
788 KB
 021
 A122
UPPER FLOOR REFLECTED CEILING PLANS
021-A122_UPPER_FLOOR_REFLECTED_CEILING_PLANS.TIF
635 KB
 022
 A151
FIRST FLOOR FINISH PLAN
022-A151_FIRST_FLOOR_FINISH_PLAN.TIF
2208 KB
 023
 A152
UPPER FLOOR FINISH PLANS
023-A152_UPPER_FLOOR_FINISH_PLANS.TIF
1975 KB
 024
 A201
EXTERIOR ELEVATIONS
024-A201_EXTERIOR_ELEVATIONS.TIF
1776 KB
 025
 A202
EXTERIOR ELEVATIONS
025-A202_EXTERIOR_ELEVATIONS.TIF
1505 KB
 026
 A211
INTERIOR ELEVATIONS AND MILLWORK DETAILS
026-A211_INTERIOR_ELEVATIONS_AND_MILLWORK_DETAILS.TIF
497 KB
 027
 A351
WALL SECTIONS
027-A351_WALL_SECTIONS.TIF
520 KB
 028
 A352
WALL SECTIONS
028-A352_WALL_SECTIONS.TIF
828 KB
 029
 A353
WALL SECTIONS
029-A353_WALL_SECTIONS.TIF
794 KB
 030
 A354
WALL SECTIONS AND DETAILS
030-A354_WALL_SECTIONS_AND_DETAILS.TIF
709 KB
 031
 A355
DETAILS
031-A355_DETAILS.TIF
393 KB
 032
 A601
OPENING SCHEDULE AND TYPES
032-A601_OPENING_SCHEDULE_AND_TYPES.TIF
533 KB
 033
 A602
OPENING DETAILS
033-A602_OPENING_DETAILS.TIF
738 KB
 034
 A611
FINISH SCHEDULE
034-A611_FINISH_SCHEDULE.TIF
562 KB
 035
 MS101
MECHANICAL SITE PLAN
035-MS101_MECHANICAL_SITE_PLAN.TIF
368 KB
 036
 PD101
PLUMBING DEMOLITION PLANS
036-PD101_PLUMBING_DEMOLITION_PLANS.TIF
298 KB
 037
 PD102
PLUMBING DEMOLITION PLANS
037-PD102_PLUMBING_DEMOLITION_PLANS.TIF
250 KB
 038
 PD103
PLUMBING DEMOLITON PLANS
038-PD103_PLUMBING_DEMOLITON_PLANS.TIF
253 KB
 039
 PD104
ROOF PLUMBING DEMOLITION PLANS
039-PD104_ROOF_PLUMBING_DEMOLITION_PLANS.TIF
124 KB
 040
 P101
PLUMBING PLAN
040-P101_PLUMBING_PLAN.TIF
358 KB
 041
 P102
PLUMBING PLAN
041-P102_PLUMBING_PLAN.TIF
284 KB
 042
 P103
PLUMBING PLANS
042-P103_PLUMBING_PLANS.TIF
290 KB
 043
 P104
PLUMBING PLANS
043-P104_PLUMBING_PLANS.TIF
287 KB
 044
 P105
PLUMBING PLANS
044-P105_PLUMBING_PLANS.TIF
295 KB
 045
 P201
BOILER BUILDING
045-P201_BOILER_BUILDING.TIF
258 KB
 046
 MD101
MECHANICAL DEMOLITION PLAN
046-MD101_MECHANICAL_DEMOLITION_PLAN.TIF
274 KB
 047
 MD102
MECHANICAL DEMOLITION PLAN
047-MD102_MECHANICAL_DEMOLITION_PLAN.TIF
257 KB
 048
 MD103
MECHANICAL DEMOLITION PLAN
048-MD103_MECHANICAL_DEMOLITION_PLAN.TIF
259 KB
 049
 MD104
ROOF MECHANICAL DEMOLITION PLAN
049-MD104_ROOF_MECHANICAL_DEMOLITION_PLAN.TIF
189 KB
 050
 MD201
HVAC PIPING DEMOLITION PLAN
050-MD201_HVAC_PIPING_DEMOLITION_PLAN.TIF
256 KB
 051
 MD202
HVAC PIPING DEMOLITION PLAN
051-MD202_HVAC_PIPING_DEMOLITION_PLAN.TIF
247 KB
 052
 MD203
HVAC PIPING DEMOLITION PLAN
052-MD203_HVAC_PIPING_DEMOLITION_PLAN.TIF
248 KB
 053
 M101
HVAC PLAN
053-M101_HVAC_PLAN.TIF
321 KB
 054
 M102
HVAC PLAN
054-M102_HVAC_PLAN.TIF
302 KB
 055
 M103
HVAC PLAN
055-M103_HVAC_PLAN.TIF
308 KB
 056
 M104
HVAC PLAN
056-M104_HVAC_PLAN.TIF
305 KB
 057
 M105
HVAC PLAN
057-M105_HVAC_PLAN.TIF
317 KB
 058
 M106
HVAC PLAN
058-M106_HVAC_PLAN.TIF
156 KB
 059
 M201
PIPING PLAN
059-M201-HVAC_PIPING_PLAN.TIF
287 KB
 060
 M202
HVAC PIPING PLAN
060-M202_HVAC_PIPING_PLAN.TIF
267 KB
 061
 M203
HVAC PIPING PLAN
061-M203_HVAC_PIPING_PLAN.TIF
267 KB
 062
 M204
HVAC PIPING PLAN
062-M204_HVAC_PIPING_PLAN.TIF
272 KB
 063
 M205
HVAC PIPING PLAN
063-M205_HVAC_PIPING_PLAN.TIF
275 KB
 064
 M206
HVAC PIPING PLAN
064-M206_HVAC_PIPING_PLAN.TIF
139 KB
 065
 M301
BOILER BUILDING
065-M301_BOILER_BUILDING.TIF
313 KB
 066
 M401
SCHEDULES AND DETAILS
066-M401_SCHEDULES_AND_DETAILS.TIF
666 KB
 067
 M402
SCHEDULES AND DETAILS
067-M402_SCHEDULES_AND_DETAILS.TIF
245 KB
 068
 FP101
FIRST FLOOR FIRE PROTECTION PLAN
068-FP101_FIRST_FLOOR_FIRE_PROTECTION_PLAN.TIF
228 KB
 069
 FP102
SECOND FOURTH FLOOR FIRE PROTECTION PLANS
069-FP102_SECOND_FOURTH_FLOOR_FIRE_PROTECTION_PLANS.TIF
213 KB
 070
 FP103
THIRD FIFTH FLOOR FIRE PROTECTION PLANS
070-FP103_THIRD_FIFTH_FLOOR_FIRE_PROTECTION_PLANS.TIF
216 KB
 071
 FP104
ROOF PLAN FIRE PROTECTION
071-FP104_ROOF_PLAN_FIRE_PROTECTION.TIF
137 KB
 072
 FP201
BOILER BUILDING FIRE PROTECTION
072-FP201_BOILER_BUILDING_FIRE_PROTECTION.TIF
328 KB
 073
 E001
ELECTRICAL LEGEND AND SCHEDULES
073-E001_ELECTRICAL_LEGEND_AND_SCHEDULES.TIF
595 KB
 074
 E002
ELECTRICAL ONE LINE DIAGRAM
074-E002_ELECTRICAL_ONE_LINE_DIAGRAM.TIF
232 KB
 075
 E003
SCHEDULES
075-E003_SCHEDULES.TIF
577 KB
 076
 E004
SCHEDULES
076-E004_SCHEDULES.TIF
466 KB
 077
 E005
SCHEDULES
077-E005_SCHEDULES.TIF
2746 KB
 078
 E006
SCHEDULES
078-E006_SCHEDULES.TIF
3161 KB
 079
 E007
SCHEDULES
079-E007_SCHEDULES.TIF
3199 KB
 080
 E008
SCHEDULES
080-E008_SCHEDULES.TIF
1078 KB
 081
 ES101
ELECTRICAL SITE PLAN
081-ES101_ELECTRICAL_SITE_PLAN.TIF
226 KB
 082
 ED101
ELECTRICAL DEMO PLAN
082-ED101_ELECTRICAL_DEMO_PLAN.TIF
646 KB
 083
 ED102
ELECTRICAL DEMO PLANS
083-ED102_ELECTRICAL_DEMO_PLANS.TIF
627 KB
 084
 ED103
ELECTRICAL DEMO PLANS
084-ED103_ELECTRICAL_DEMO_PLANS.TIF
632 KB
 085
 ED104
ELECTRICAL DEMO ROOF PLAN
085-ED104_ELECTRICAL_DEMO_ROOF_PLAN.TIF
297 KB
 086
 E101
FIRST FLOOR LIGHTING PLAN
086-E101_FIRST_FLOOR_LIGHTING_PLAN.TIF
714 KB
 087
 E102
SECOND FOURTH FLOOR LIGHTING PLAN
087-E102_SECOND_FOURTH_FLOOR_LIGHTING_PLAN.TIF
650 KB
 088
 E103
THIRD FIFTH FLOOR LIGHTING PLAN
088-E103_THIRD_FIFTH_FLOOR_LIGHTING_PLAN.TIF
659 KB
 089
 E201
FIRST FLOOR POWER PLAN
089-E201_FIRST_FLOOR_POWER_PLAN.TIF
660 KB
 090
 E202
SECOND FOURTH FLOOR POWER PLAN
090-E202_SECOND_FOURTH_FLOOR_POWER_PLAN.TIF
606 KB
 091
 E203
THIRD FIFTH FLOOR POWER PLAN
091-E203_THIRD_FIFTH_FLOOR_POWER_PLAN.TIF
622 KB
 092
 E204
FIRST FLOOR MECHANICAL CONNECTIONS
092-E204_FIRST_FLOOR_MECHANICAL_CONNECTIONS.TIF
665 KB
 093
 E205
SECOND FLOOR MECHANICAL CONNECTIONS
093-E205_SECOND_FLOOR_MECHANICAL_CONNECTIONS.TIF
627 KB
 094
 E206
THIRD FLOOR MECHANICAL CONNECTIONS
094-E206_THIRD_FLOOR_MECHANICAL_CONNECTIONS.TIF
300 KB
 095
 E207
FOURTH FLOOR MECHANICAL CONNECTIONS
095-E207_FOURTH_FLOOR_MECHANICAL_CONNECTIONS.TIF
295 KB
 096
 E208
FIFTH FLOOR MECHANICAL CONNECTIONS
096-E208_FIFTH_FLOOR_MECHANICAL_CONNECTIONS.TIF
301 KB
 097
 E209
ROOF PLAN MECHANICAL CONNECTIONS
097-E209_ROOF_PLAN_MECHANICAL_CONNECTIONS.TIF
321 KB
 098
 E401
ELECTRICAL BOILER PLAN
098-E401_ELECTRICAL_BOILER_PLAN.TIF
387 KB
 099
 E501
ELECTRICAL DETAILS
099-E501_ELECTRICAL_DETAILS.TIF
378 KB
 100
 F001
FIRE ALARM RISER DIAGRAM
100-F001_FIRE_ALARM_RISER_DIAGRAM.TIF
174 KB
 101
 F101
FIRST FLOOR FIRE ALARM PLAN
101-F101_FIRST_FLOOR_FIRE_ALARM_PLAN.TIF
602 KB
 102
 F102-SECOND
FOURTH FLOOR FIRE ALARM PLAN
102-F102-SECOND_FOURTH_FLOOR_FIRE_ALARM_PLAN.TIF
570 KB
 103
 F103-THIRD
FIFTH FLOOR FIRE ALARMPLAN
103-F103-THIRD_FIFTH_FLOOR_FIRE_ALARMPLAN.TIF
578 KB
 104
 T001
COMMUNICATIONS RISER DIAGRAM
104-T001_COMMUNICATIONS_RISER_DIAGRAM.TIF
126 KB
 105
 T101
COMMUNICATIONS FIRST FLOOR PLAN
105-T101_COMMUNICATIONS_FIRST_FLOOR_PLAN.TIF
644 KB
 106
 T102
COMMUNICATIONS SECOND FOURTH FLOOR PLAN
106-T102_COMMUNICATIONS_SECOND_FOURTH_FLOOR_PLAN.TIF
604 KB
 107
 T103
COMMUNICATIONS THIRD FIFTH FLOOR PLAN
107-T103_COMMUNICATIONS_THIRD_FIFTH_FLOOR_PLAN.TIF
608 KB