Planroom Menu
Jackson Blueprint Home
Planroom Home

Public Jobs
Private Jobs (with password)
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Phase 5 District office, Phase 6 Corporate Headquarters for Southern Pine Electric

2 separate buildings on same campus, bid under one contract
District Office-15,000 sf single story, cold formed framing with red iron superstructure.
Headquarters-85,000 sf heated/cooled, 2 story construction. Structural steel, cold formed exterior wall system
Standing Seam Roof, fencing, Asphalt Paving, Concrete Paving, Pedestrian Cover, Brick Veneer, Cast Stone, Cold-Formed Metal, Structural Steel, Metal Trusses Frameless Glass, Curtain Wall, Aluminum Windows, Mod Bit Roofing, ACM Wall Panels, Coping, Division 10, Wood Doors, Precast Terrazzo, Carpeting, Kitchen Equipment, Window Shades, Elevator, Folding Stage, Casework, Wire Partition, Wall Cover, Ceramic Tile, Interior Carpentry, Landscape Planting, Irrigation, Fire Protection, HVAC, Plumbing
            
  Name Delivery Method Date
Addendum_1_Phase_5_drawings.pdf

10/3/2016
Addendum_1_Phase_6_drawings.pdf

10/3/2016
Addendum_1_Specs.pdf

10/3/2016
addendum_02_CONSOLIDATED.pdf

10/21/2016
addendum_03_CONSOLIDATED.pdf

10/26/2016